Permit Number: TC-COM-1222-00337
Parcel: 11504495A

Address:
1001 N PARK AV

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1

Permit Number - TC-COM-1222-00337
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/28/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
05/28/2024 External Reviewers - Stantec REQUIRES RESUBMIT May 28, 2024
1st Review

Core Spaces
Attn: Jonathan Kubow
1643 N. Milwaukee Avenue, 5th Floor
Chicago, Illinois 60647

Re: HUB V
NEW BUILDING (DEFERRED SUBMITTALS)

City of Tucson Permit Number: TC-COM-1222-00337
Stantec Project Number: 185215066
Stantec File Number: TUC-24-052

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. To facilitate a shorter back-check time, we request that you please, only provide plans and calculation pages that have been revised, clouding any changes, along with a written response to each of the noted items indicating the action taken.

The scope of this review covers the architectural and structural designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
B I-A 292,671 1,153 Yes Yes
A-3
R-2
S-2
Separate Permits: Automatic fire sprinklers and fire alarm
Deferred Submittals: Metal Stairs, handrails, guards, reinforcing sizes and locations for post-tension slabs, and two-way communication system.
Special Inspections: Concrete, post-tension, epoxy and expansion anchors, structural steel, high-strength bolts, field welding, masonry, spray fire-resistant materials, intumescent materials, fire-resistant penetrations and joints (high-rises), EFIS, and outdoor lighting.

ARCHITECTURAL COMMENTS

General

1. The hoist way plans indicate “Preliminary-Not to be used for construction”. Please provide complete drawings for construction.
2. Please provide the proposed location of the hoist way crane. The approved plans dated 4/24/2024 indicate a crane location inside the building. The hoist shop drawings appear to indicate that it will be erected on the outside of the building. Please clarify.

3. The shop drawings indicate the embeds and parapet wall reinforcement is by others. Please provide and engineered design for these elements.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

There are no comments.

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

There are no comments.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans Reviewed By:
Trevor Bies
Senior Plan Reviewer
(602) 338-9922
Trevor.Bies@stantec.com
05/21/2024 PDSD Application Completeness REVIEW COMPLETED