Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-1222-00337
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/23/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/23/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. | ||
| 04/23/2025 | Masonry Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. | ||
| 04/23/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | EPOXY Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. |
||
| 04/23/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | Expansion Anchors Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. |
||
| 04/23/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | High Strength Bolting Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. |
||
| 04/23/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | STEEL Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. |
||
| 04/23/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | Structural Masonry Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. |
||
| 04/23/2025 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. | ||
| 04/23/2025 | Site Prep Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. | ||
| 04/23/2025 | Welding Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please submit reports for Structural Masonry inspection, Expansion Anchors, High Strength Bolting, and Masonry Inspection to fulfill all conditions. Or submit a letter by an engineer stating they are not required. | ||
| 04/18/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |