Permit Number: TC-COM-1124-02102
Parcel: 123100280

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-1124-02102
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/27/2024 Site Zoning APPROVED
11/27/2024 Water - PDSD APPROVED
11/27/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
11/18/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 11/18/2024 6:30:10 PM
1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be
reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments.
2. S001 - SEISMIC DESIGN CRITERIA: On the structural general notes, under "Earthquake Loads", the assumed Spectral Accelerations "Ss", "Sds" and "Sd1" do not meet the minimum accelerations prescribed by the ASCE 7-16 manual. As a result, this project falls under Seismic Design Category C (not "A"). Please verify that all connections related to equipment support frames and the new patient lift have been designed for the lateral demands of SDC C and update the structural general notes to reflect the correct loads. Refer to the Online Hazard Tool supported by the
American Society of Civil Engineers for more information: https://ascehazardtool.org/
3. S201 - MISSING BEAM SIZES: The Second Level Partial Framing Plan and "Typ Medical Equipment Support Frame" detail on Sheet S201 show new HSS beams spanning between the existing WF floor girders. These beams have not
been sized and calculations have not been provided to confirm their design. Please revise the plan sheets to include sizes for all proposed structural members.





Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 11/15/2024 11:29:09 AM



Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 11/15/2024 4:12:35 PM
1. General - Provide exhaust in CT Equipment room. - 2018 IMC Section 502.1 REQUIRED SYSTEMS
2. General - Provide Ventilation Calculations for new space.. Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space.




Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 11/5/2024 5:31:37 PM




Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 11/17/2024 11:40:26 AM
FIRST PLUMBING REVIEW:
1). Project Manual Specification Med Gas Section 22 6316 page 1- 1.3: Incorrect Code Reference Stated. Update code reference to NFPA99-2018
2), Plan Page MG201: General Notes #10 Incorrect Code Reference Stated. Update code reference to NFPA99-2018
11/15/2024 Fire New Construction REVIEW COMPLETED
11/01/2024 PDSD Application Completeness REVIEW COMPLETED
11/18/2024 Site Engineering REVIEW COMPLETED