Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-1124-02102
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/27/2024 | Site Zoning | APPROVED | |||
11/27/2024 | Water - PDSD | APPROVED | |||
11/27/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/18/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 11/18/2024 6:30:10 PM 1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments. 2. S001 - SEISMIC DESIGN CRITERIA: On the structural general notes, under "Earthquake Loads", the assumed Spectral Accelerations "Ss", "Sds" and "Sd1" do not meet the minimum accelerations prescribed by the ASCE 7-16 manual. As a result, this project falls under Seismic Design Category C (not "A"). Please verify that all connections related to equipment support frames and the new patient lift have been designed for the lateral demands of SDC C and update the structural general notes to reflect the correct loads. Refer to the Online Hazard Tool supported by the American Society of Civil Engineers for more information: https://ascehazardtool.org/ 3. S201 - MISSING BEAM SIZES: The Second Level Partial Framing Plan and "Typ Medical Equipment Support Frame" detail on Sheet S201 show new HSS beams spanning between the existing WF floor girders. These beams have not been sized and calculations have not been provided to confirm their design. Please revise the plan sheets to include sizes for all proposed structural members. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 11/15/2024 11:29:09 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 11/15/2024 4:12:35 PM 1. General - Provide exhaust in CT Equipment room. - 2018 IMC Section 502.1 REQUIRED SYSTEMS 2. General - Provide Ventilation Calculations for new space.. Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 11/5/2024 5:31:37 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 11/17/2024 11:40:26 AM FIRST PLUMBING REVIEW: 1). Project Manual Specification Med Gas Section 22 6316 page 1- 1.3: Incorrect Code Reference Stated. Update code reference to NFPA99-2018 2), Plan Page MG201: General Notes #10 Incorrect Code Reference Stated. Update code reference to NFPA99-2018 |
||
11/15/2024 | Fire New Construction | REVIEW COMPLETED | |||
11/01/2024 | PDSD Application Completeness | REVIEW COMPLETED | |||
11/18/2024 | Site Engineering | REVIEW COMPLETED |