Permit Number: TC-COM-0625-01161
Parcel: 133231470

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0625-01161
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/11/2025 Outdoor Lighting Standard APPROVED An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf
08/15/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/05/2025 Commercial Building Standard REQUIRES RESUBMIT August 5, 2025
2nd Review

Shive-Hattery
Attn: John Price/Kristen DiBone
4330 N. Campbell Ave. #268
Tucson, Arizona 85718

Re: CGI FEDERAL ANNEX BUILDING
NEW BUILDING

City of Tucson Permit Number: TC-COM-0625-01161
Stantec Project Number: 185215066
Stantec File Number: TUC-25-069

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-2 V-B 15,529 327 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: Wood ‘I’ Joists, steel stairs, and elevator shop drawings
Special Inspections: Earthwork, concrete, caissons, piles, post-tension, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting.

GENERAL COMMENTS

1. Addressed.

2. Addressed.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Please indicate on the cover that the steel stairs shop drawings, elevator shop drawings, and wood ‘I’ joists will be provided as part of a deferred submittal. Still Required: The deferred submittal list was added to the cover but missing the elevator shop drawings from the list. A racking system is also indicated as a deferred submittal but the plans for the annex do not indicate the use of a racking system. Please clarify.

3. Previous Comment: Note on the cover of the drawings that special inspection is required for earthwork, concrete, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: A special inspection certificate was not provided for the required special inspections as requested in the previous comment letter. Please provide with the next submittal.

4. Addressed.

5. Previous Comment: Please provide approved and listed through and membrane penetration assemblies along with details of the assemblies. [Ref. IBC 2018 Sec. 714.5.2] New Comment: The revised plans included a narrative on the testing that through/membrane penetration firestop systems must meet but did not provide specific listed assemblies. Please revise.

6. New Comment: Please add new Sheet A001.3 into the sheet index.

7. New Comment: Sheets S6.0.1, S7.0.1, and S7.1.1 are missing from the plan set. Please resubmit with these sheets included.

Sheet C1.0

1. Addressed.

Sheet A101.2

1. Addressed.

2. Previous Comment: Elevator control rooms outside of but attached to hoist ways must be enclosed by 1-hour fire barriers. Please revise and include the listed rated assembly for the fire barriers. [Ref. IBC 2018 Sec. 3005.4] Still Required: The fire barriers have been indicated but a horizontal assembly is not provided for this room. Please provide a listed horizontal assembly for the elevator control room.

3. Addressed.

4. New Comment: The revised sheet is missing the page and detail numbers for the cross-section indicator at the lobby stair, the enlarged plan indicators of the elevator shafts and control room and multiple other areas. Please revise.

Sheet A102.2

1. Addressed.

2. Previous Comment: Please indicate a method of compliance for the duct penetrations in the equipment room floor. Is this intended to be a shaft enclosure in accordance with Section 713 or one of the other methods indicated in Section 717.6.3? Please clarify. Still Required: The revised plan included new detail C3 on Sheet A500.2 for the equipment room shaft enclosure. The detail raises a few concerns:

a. The shaft is not enclosed at the top so a horizontal assembly would be required to make the shaft enclosure compliant. The current design indicates the fire barrier essentially turned horizontally to create a horizontal assembly.

b. The listed assembly used is only compliant as a non-bearing wall not a ceiling assembly. A listed horizontal assembly would need to be used along with fire barriers to create the fire-rated envelope.

c. I would suggest that instead of using a shaft enclosure and horizontal assembly, Section 717.6.3 #3 allows for ducts to penetrate non-fire resistance rated floor assemblies without the use of a shaft enclosure if the annular space around the penetrating duct is protected with approved noncombustible material that resists the free passage of flame and the products combustion.

Sheet A111.2

1. New Comment: The plan indicates the elevator control room is open to the structure above. Please provide a listed horizontal assembly for this room. [Ref. IBC 2018 Sec. 3005.4]

STRUCTURAL COMMENTS

General

1. Addressed.

2. Addressed.

3. Addressed.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.

Sheet M301

1. Addressed.

PLUMBING COMMENTS

Sheet FP101

1. Addressed.

ELECTRICAL COMMENTS

Sheet E301

1. Addressed.

Sheet E401

1. Addressed.

Sheet E604

1. Addressed.

2. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
08/05/2025 Commercial Electrical Standard REQUIRES RESUBMIT August 5, 2025
2nd Review

Shive-Hattery
Attn: John Price/Kristen DiBone
4330 N. Campbell Ave. #268
Tucson, Arizona 85718

Re: CGI FEDERAL ANNEX BUILDING
NEW BUILDING

City of Tucson Permit Number: TC-COM-0625-01161
Stantec Project Number: 185215066
Stantec File Number: TUC-25-069

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-2 V-B 15,529 327 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: Wood ‘I’ Joists, steel stairs, and elevator shop drawings
Special Inspections: Earthwork, concrete, caissons, piles, post-tension, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting.

GENERAL COMMENTS

1. Addressed.

2. Addressed.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Please indicate on the cover that the steel stairs shop drawings, elevator shop drawings, and wood ‘I’ joists will be provided as part of a deferred submittal. Still Required: The deferred submittal list was added to the cover but missing the elevator shop drawings from the list. A racking system is also indicated as a deferred submittal but the plans for the annex do not indicate the use of a racking system. Please clarify.

3. Previous Comment: Note on the cover of the drawings that special inspection is required for earthwork, concrete, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: A special inspection certificate was not provided for the required special inspections as requested in the previous comment letter. Please provide with the next submittal.

4. Addressed.

5. Previous Comment: Please provide approved and listed through and membrane penetration assemblies along with details of the assemblies. [Ref. IBC 2018 Sec. 714.5.2] New Comment: The revised plans included a narrative on the testing that through/membrane penetration firestop systems must meet but did not provide specific listed assemblies. Please revise.

6. New Comment: Please add new Sheet A001.3 into the sheet index.

7. New Comment: Sheets S6.0.1, S7.0.1, and S7.1.1 are missing from the plan set. Please resubmit with these sheets included.

Sheet C1.0

1. Addressed.

Sheet A101.2

1. Addressed.

2. Previous Comment: Elevator control rooms outside of but attached to hoist ways must be enclosed by 1-hour fire barriers. Please revise and include the listed rated assembly for the fire barriers. [Ref. IBC 2018 Sec. 3005.4] Still Required: The fire barriers have been indicated but a horizontal assembly is not provided for this room. Please provide a listed horizontal assembly for the elevator control room.

3. Addressed.

4. New Comment: The revised sheet is missing the page and detail numbers for the cross-section indicator at the lobby stair, the enlarged plan indicators of the elevator shafts and control room and multiple other areas. Please revise.

Sheet A102.2

1. Addressed.

2. Previous Comment: Please indicate a method of compliance for the duct penetrations in the equipment room floor. Is this intended to be a shaft enclosure in accordance with Section 713 or one of the other methods indicated in Section 717.6.3? Please clarify. Still Required: The revised plan included new detail C3 on Sheet A500.2 for the equipment room shaft enclosure. The detail raises a few concerns:

a. The shaft is not enclosed at the top so a horizontal assembly would be required to make the shaft enclosure compliant. The current design indicates the fire barrier essentially turned horizontally to create a horizontal assembly.

b. The listed assembly used is only compliant as a non-bearing wall not a ceiling assembly. A listed horizontal assembly would need to be used along with fire barriers to create the fire-rated envelope.

c. I would suggest that instead of using a shaft enclosure and horizontal assembly, Section 717.6.3 #3 allows for ducts to penetrate non-fire resistance rated floor assemblies without the use of a shaft enclosure if the annular space around the penetrating duct is protected with approved noncombustible material that resists the free passage of flame and the products combustion.

Sheet A111.2

1. New Comment: The plan indicates the elevator control room is open to the structure above. Please provide a listed horizontal assembly for this room. [Ref. IBC 2018 Sec. 3005.4]

STRUCTURAL COMMENTS

General

1. Addressed.

2. Addressed.

3. Addressed.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.

Sheet M301

1. Addressed.

PLUMBING COMMENTS

Sheet FP101

1. Addressed.

ELECTRICAL COMMENTS

Sheet E301

1. Addressed.

Sheet E401

1. Addressed.

Sheet E604

1. Addressed.

2. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
08/05/2025 Commercial Mechanical Standard REQUIRES RESUBMIT August 5, 2025
2nd Review

Shive-Hattery
Attn: John Price/Kristen DiBone
4330 N. Campbell Ave. #268
Tucson, Arizona 85718

Re: CGI FEDERAL ANNEX BUILDING
NEW BUILDING

City of Tucson Permit Number: TC-COM-0625-01161
Stantec Project Number: 185215066
Stantec File Number: TUC-25-069

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-2 V-B 15,529 327 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: Wood ‘I’ Joists, steel stairs, and elevator shop drawings
Special Inspections: Earthwork, concrete, caissons, piles, post-tension, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting.

GENERAL COMMENTS

1. Addressed.

2. Addressed.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Please indicate on the cover that the steel stairs shop drawings, elevator shop drawings, and wood ‘I’ joists will be provided as part of a deferred submittal. Still Required: The deferred submittal list was added to the cover but missing the elevator shop drawings from the list. A racking system is also indicated as a deferred submittal but the plans for the annex do not indicate the use of a racking system. Please clarify.

3. Previous Comment: Note on the cover of the drawings that special inspection is required for earthwork, concrete, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: A special inspection certificate was not provided for the required special inspections as requested in the previous comment letter. Please provide with the next submittal.

4. Addressed.

5. Previous Comment: Please provide approved and listed through and membrane penetration assemblies along with details of the assemblies. [Ref. IBC 2018 Sec. 714.5.2] New Comment: The revised plans included a narrative on the testing that through/membrane penetration firestop systems must meet but did not provide specific listed assemblies. Please revise.

6. New Comment: Please add new Sheet A001.3 into the sheet index.

7. New Comment: Sheets S6.0.1, S7.0.1, and S7.1.1 are missing from the plan set. Please resubmit with these sheets included.

Sheet C1.0

1. Addressed.

Sheet A101.2

1. Addressed.

2. Previous Comment: Elevator control rooms outside of but attached to hoist ways must be enclosed by 1-hour fire barriers. Please revise and include the listed rated assembly for the fire barriers. [Ref. IBC 2018 Sec. 3005.4] Still Required: The fire barriers have been indicated but a horizontal assembly is not provided for this room. Please provide a listed horizontal assembly for the elevator control room.

3. Addressed.

4. New Comment: The revised sheet is missing the page and detail numbers for the cross-section indicator at the lobby stair, the enlarged plan indicators of the elevator shafts and control room and multiple other areas. Please revise.

Sheet A102.2

1. Addressed.

2. Previous Comment: Please indicate a method of compliance for the duct penetrations in the equipment room floor. Is this intended to be a shaft enclosure in accordance with Section 713 or one of the other methods indicated in Section 717.6.3? Please clarify. Still Required: The revised plan included new detail C3 on Sheet A500.2 for the equipment room shaft enclosure. The detail raises a few concerns:

a. The shaft is not enclosed at the top so a horizontal assembly would be required to make the shaft enclosure compliant. The current design indicates the fire barrier essentially turned horizontally to create a horizontal assembly.

b. The listed assembly used is only compliant as a non-bearing wall not a ceiling assembly. A listed horizontal assembly would need to be used along with fire barriers to create the fire-rated envelope.

c. I would suggest that instead of using a shaft enclosure and horizontal assembly, Section 717.6.3 #3 allows for ducts to penetrate non-fire resistance rated floor assemblies without the use of a shaft enclosure if the annular space around the penetrating duct is protected with approved noncombustible material that resists the free passage of flame and the products combustion.

Sheet A111.2

1. New Comment: The plan indicates the elevator control room is open to the structure above. Please provide a listed horizontal assembly for this room. [Ref. IBC 2018 Sec. 3005.4]

STRUCTURAL COMMENTS

General

1. Addressed.

2. Addressed.

3. Addressed.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.

Sheet M301

1. Addressed.

PLUMBING COMMENTS

Sheet FP101

1. Addressed.

ELECTRICAL COMMENTS

Sheet E301

1. Addressed.

Sheet E401

1. Addressed.

Sheet E604

1. Addressed.

2. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
08/05/2025 Commercial Plumbing Standard REQUIRES RESUBMIT August 5, 2025
2nd Review

Shive-Hattery
Attn: John Price/Kristen DiBone
4330 N. Campbell Ave. #268
Tucson, Arizona 85718

Re: CGI FEDERAL ANNEX BUILDING
NEW BUILDING

City of Tucson Permit Number: TC-COM-0625-01161
Stantec Project Number: 185215066
Stantec File Number: TUC-25-069

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
A-2 V-B 15,529 327 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: Wood ‘I’ Joists, steel stairs, and elevator shop drawings
Special Inspections: Earthwork, concrete, caissons, piles, post-tension, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting.

GENERAL COMMENTS

1. Addressed.

2. Addressed.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Please indicate on the cover that the steel stairs shop drawings, elevator shop drawings, and wood ‘I’ joists will be provided as part of a deferred submittal. Still Required: The deferred submittal list was added to the cover but missing the elevator shop drawings from the list. A racking system is also indicated as a deferred submittal but the plans for the annex do not indicate the use of a racking system. Please clarify.

3. Previous Comment: Note on the cover of the drawings that special inspection is required for earthwork, concrete, epoxy and expansion anchors, structural steel, cold-formed steel deck, high-strength bolts, field welding, masonry, water-resistive barrier coating, and outdoor lighting. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: A special inspection certificate was not provided for the required special inspections as requested in the previous comment letter. Please provide with the next submittal.

4. Addressed.

5. Previous Comment: Please provide approved and listed through and membrane penetration assemblies along with details of the assemblies. [Ref. IBC 2018 Sec. 714.5.2] New Comment: The revised plans included a narrative on the testing that through/membrane penetration firestop systems must meet but did not provide specific listed assemblies. Please revise.

6. New Comment: Please add new Sheet A001.3 into the sheet index.

7. New Comment: Sheets S6.0.1, S7.0.1, and S7.1.1 are missing from the plan set. Please resubmit with these sheets included.

Sheet C1.0

1. Addressed.

Sheet A101.2

1. Addressed.

2. Previous Comment: Elevator control rooms outside of but attached to hoist ways must be enclosed by 1-hour fire barriers. Please revise and include the listed rated assembly for the fire barriers. [Ref. IBC 2018 Sec. 3005.4] Still Required: The fire barriers have been indicated but a horizontal assembly is not provided for this room. Please provide a listed horizontal assembly for the elevator control room.

3. Addressed.

4. New Comment: The revised sheet is missing the page and detail numbers for the cross-section indicator at the lobby stair, the enlarged plan indicators of the elevator shafts and control room and multiple other areas. Please revise.

Sheet A102.2

1. Addressed.

2. Previous Comment: Please indicate a method of compliance for the duct penetrations in the equipment room floor. Is this intended to be a shaft enclosure in accordance with Section 713 or one of the other methods indicated in Section 717.6.3? Please clarify. Still Required: The revised plan included new detail C3 on Sheet A500.2 for the equipment room shaft enclosure. The detail raises a few concerns:

a. The shaft is not enclosed at the top so a horizontal assembly would be required to make the shaft enclosure compliant. The current design indicates the fire barrier essentially turned horizontally to create a horizontal assembly.

b. The listed assembly used is only compliant as a non-bearing wall not a ceiling assembly. A listed horizontal assembly would need to be used along with fire barriers to create the fire-rated envelope.

c. I would suggest that instead of using a shaft enclosure and horizontal assembly, Section 717.6.3 #3 allows for ducts to penetrate non-fire resistance rated floor assemblies without the use of a shaft enclosure if the annular space around the penetrating duct is protected with approved noncombustible material that resists the free passage of flame and the products combustion.

Sheet A111.2

1. New Comment: The plan indicates the elevator control room is open to the structure above. Please provide a listed horizontal assembly for this room. [Ref. IBC 2018 Sec. 3005.4]

STRUCTURAL COMMENTS

General

1. Addressed.

2. Addressed.

3. Addressed.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.

Sheet M301

1. Addressed.

PLUMBING COMMENTS

Sheet FP101

1. Addressed.

ELECTRICAL COMMENTS

Sheet E301

1. Addressed.

Sheet E401

1. Addressed.

Sheet E604

1. Addressed.

2. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
08/14/2025 Fire New Construction Standard REQUIRES RESUBMIT -Sheet G100.2, make correction to IFC edition on applicable codes. COT/TFD has adopted the 2024 version of the IFC. -Resolve all building comments.
Questions: patricia.shelton@tucsonaz.gov
08/15/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Bobby Parsons
Zoning Section Review

PROJECT:
TC-COM-0625-01161
7333 E. Rosewood St. Tucson, AZ 85710
New 2 story office building (2nd Review)

TRANSMITTAL DATE: 8/15/2025

The site is located in PAD-3 (Gateway Centre PAD). Commercial Administrative and Professional Office and Storage are permitted uses per Gateway Centre PAD-3 document.

Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed.

1. Comment: Previous comment 1 not addressed. When comparing the plans for issued Development Package (DP) TD-DEV-0924-00272 and the plans submitted for TC-COM-0625-01161, there are some discrepancies in the square footage of the new training center building and the heights. In the issued DP, the square footage of the training center is listed as 14,602sf while the Commercial Building permit has the square footage listed as 14,823sf. Also, the proposed height on the approved DP is 40’ however the Commercial Building permit has the height listed as 48’. If these dimensions are correct, a revision to TD-DEV-0924-00272 will be required as the building plans need to match the development package.

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.
07/30/2025 PDSD Application Completeness Express REVIEW COMPLETED