Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0425-00796
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/08/2025 | Commercial Building Standard | APPROVED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 5/1/2025 5:01:57 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/5/2025 2:50:25 PM |
||
| 05/08/2025 | Commercial Electrical Standard | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 5/3/2025 6:45:50 PM |
||
| 05/08/2025 | Commercial Plumbing Standard | APPROVED | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 5/8/2025 9:54:54 PM First Plumbing Review: OK |
||
| 05/08/2025 | Outdoor Lighting Standard | APPROVED | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 5/3/2025 6:45:50 PM |
||
| 05/16/2025 | Site Engineering Standard | APPROVED | |||
| 05/15/2025 | Site Zoning Standard | APPROVED | |||
| 05/14/2025 | Water - PDSD Standard | APPROVED | |||
| 05/16/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/08/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 5/6/2025 5:32:48 PM 1. General - Include in the Ventilation schedule on Plan Sheet M-002 the warehouse area. Specify on the drawings the outdoor air required by the 2018 IMC Section 403.3.1.1 Substantiate compliance by providing calculations on the drawings which indicates the floor area (sq. ft), maximum occupant load, minimum required ventilation rate (cfm) for each occupancy, and total ventilation rate provided to the occupied space. 2. General - Provide in the Mechanical section plan sheets the warehouse area. Show all intake louvers, exhaust fans. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents. |
||
| 05/13/2025 | Fire New Construction Standard | REVIEW COMPLETED | Alterations to the fire alarm or fire sprinklers system requires a separate submittal and permit. Fire extinguishers shall comply with section 906 of the 2018 IFC | ||
| 04/23/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |