Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel14044004C
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningI-2
Tucson WardWard 5
Flood Related InformationFEMA Floodplain Area
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 01/01/2026 5:14 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-22-01 Airpark 10 Annexation District 11932 06/19/2022 11932

Permits

Parcel Number - 14044004C
Date - 01/01/2026 5:14 a.m.
Total Number Of Permits - (26)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-COM-0125-00114 Void 01/17/2025 N/A BLDG 2 Commercial Building ** VOID: YL- Unable to process for incorrect permit type. According to the permit description and Fire sprinkler monitoring device location plan, please apply for a Fire Construction Permit. This permit will be voided as it is not the correct permit type. For questions, Building_Official@tucsonaz.gov or you can visit the Tucson Fire Department (TFD) contact us section at: https://www.tucsonaz.gov/Departments/Fire/Get-Fire-Permits-and-Code-Info ** - Installing New Fire Alarm System for Sprinkler Monitoring. Core and Shell.
TC-COM-0125-00115 Void 01/17/2025 N/A BLDG 3 Commercial Building ** VOID: YL- Unable to process for incorrect permit type. According to the permit description and Fire sprinkler monitoring device location plan, please apply for a Fire Construction Permit. This permit will be voided as it is not the correct permit type. For questions, Building_Official@tucsonaz.gov or you can visit the Tucson Fire Department (TFD) contact us section at: https://www.tucsonaz.gov/Departments/Fire/Get-Fire-Permits-and-Code-Info ** - Installation of New Fire Alarm System for Sprinkler Monitoring.
TF-FCP-0125-00058 Complete 01/21/2025 09/06/2025 BLDG 2 Fire Construction Permit Installation of Fire Alarm System for Sprinkler Monitoring.
TF-FCP-0125-00059 Complete 01/21/2025 09/06/2025 BLDG 3 Fire Construction Permit Installation of a New Fire Alarm Sytem for Sprinkler Monitoring.
TR-ROW-0225-00233 Complete 02/19/2025 04/19/2025 BLDG 2 Right-of-Way (ROW) Traffic Control setup for related off-site improvements for TR-PIA-1122-00001 - I-10 International I-2023-001 along E. Los Reales Rd. This will run from East of S. Alvernon Way to the end of the construction line.
TC-COM-0425-00796 Complete 04/21/2025 06/15/2026 BLDG 2 Commercial Building SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.
TC-COM-0425-00797 Complete 04/21/2025 06/15/2026 BLDG 3 Commercial Building SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.
TR-UTL-0425-00691 Complete 04/25/2025 08/14/2025 Right-of-Way (ROW) - Utility Cox to aerial overlash 2,896' of fiber and trench 10' to install conduit for system tie.
DP22-0122 Inspections complete 05/09/2022 12/11/2028 Development Package Revision 2 - Site/Grading/Swppp/Floodplain: I-10 International. New commercial storage.
T22CM03954 Revision fees due 05/24/2022 06/10/2026 BLDG 2 Commercial Building REV 3: Outdoor lighting calculations corrections. REV2: East Elevation of building 2 o Revise the downspout termination elevation Sheet A1.0. SES location identified and additional dock door on the east side of Building 2 Sheet A1.1 SES location identified, additional dock door and fire riser location noted on the east side of Building 2 Sheet A2.0 SES location identified and additional dock door noted on the east side of Building 2 Sheet A2.1 SES location identified, additional dock door and noted on the east side & an added at grade door on the north end of Building 2 Sheet A2.2 Added at grade door on the south end of Building 2 and updated door types Sheet A4.1 Added at grade door on the north end of Building 2 Sheet A4.2 Added at grade door on the south end of Building 2 Sheet A6.1a Updated ramp width Sheet S2.1 Ramp width updates Sheet S2.2 Ramp width update Sheet S3.1 Grid C girder update Sheet S3.2 Grid C girder update Sheet S4.1 Panel 2 update Sheet S4.2 Panel 52, 63 & 66 updates Sheet S4.3 Panel U update Sheet MP3.1 Plumbing location update Sheet MP3.2 Plumbing location update Sheet E4.1 Lighting update Sheet E4.2 Lighting update Sheet E6.0 Panel updates NEW INDUSTRIAL WAREHOUSE BUILDING #2 Shell
T22CM03955 Revision fees due 05/24/2022 06/10/2026 BLDG 3 Commercial Building NEW INDUSTRIAL WAREHOUSE BUILDING #3 Shell
TC-CFO-0825-00117 Issued 08/15/2025 09/18/2025 BLDG 2 Certificate of Occupancy NEW INDUSTRIAL WAREHOUSE BUILDING
TC-CFO-0825-00118 Issued 08/15/2025 09/18/2025 BLDG 3 Certificate of Occupancy NEW INDUSTRIAL WAREHOUSE BUILDING
TF-FCP-0925-00764 Inspections complete 09/09/2025 03/10/2026 BLDG 2 Fire Construction Permit DOUBLE EXPEDITE - Installation of a new wet quick-response sprinkler system supplied by the existing overhead.
TF-FCP-0925-00765 Void 09/09/2025 N/A BLDG 3 Fire Construction Permit VOID - Submit under Permit#TF-FCP-1224-01094 & Attach 2025 COT Business License - DOUBLE EXPEDITE - Installation of a new wet quick-response sprinkler system supplied by the existing overhead.
TE-FPU-1025-00397 Complete 10/29/2025 N/A BLDG 2 Floodplain Use NEW INDUSTRIAL WAREHOUSE BUILDING #2
TE-FPU-1025-00398 Complete 10/29/2025 N/A BLDG 3 Floodplain Use NEW INDUSTRIAL WAREHOUSE BUILDING #3
TF-FCP-1125-00951 Complete 11/05/2025 05/06/2026 BLDG 2 Fire Construction Permit DOUBLE EXPEDITE-Fire alarm modi?cation Adding notification devices to an existing fire alarm system to accommodate an office build out.
TF-FCP-1125-00952 Complete 11/05/2025 05/06/2026 BLDG 3 Fire Construction Permit DOUBLE EXPEDITE-Fire alarm modi?cation Adding notification devices to an existing fire alarm system to accommodate an office build out.
TD-DEV-1124-00302 Void 11/07/2024 11/07/2025 Development Package VOID - Customer to continue with DP22-0122 -Phased revision to previously approved development plan
TR-PIA-1122-00001 Approved 11/21/2022 11/04/2026 Private Improvement Agreement (PIA) Offsite Improvement Plans for I-10 International (Airpark 10) - Along Los Reales Road and Alvernon Way, including new widen roads, asphalt multi-use path, concrete sidewalk, ADA Ramps, header, curb, driveways, drainage retention areas, and new striping
TF-FCP-1224-01026 Void 12/03/2024 N/A Fire Construction Permit VOID- Contractor resubmitted for each building and this was for the 2 buildings combined - Need Construction Permit to add underground fire line.
TF-FCP-1224-01027 Complete 12/03/2024 12/16/2025 BLDG 2 Fire Construction Permit EXPEDITE - Install Underground Private Fire Line
TF-FCP-1224-01028 Complete 12/03/2024 12/16/2025 BLDG 3 Fire Construction Permit EXPEDITE - Install Underground Private Fire Line
TF-FCP-1224-01094 Inspections complete 12/17/2024 09/04/2025 BLDG 3 Fire Construction Permit There is a total of (6) new wet pipe sprinkler systems in Building 3. (3) Risers will be fed from an electric fire pump rated for 1500GPM at 95PSI. This pump is located in the pump room connected to the building, near Column 18 of Grid A. (3) remote risers are located near Column 10 of Grid A. They will be fed from the pump room located near Column 18 of Grid A.
TF-FCP-1224-01095 Complete 12/17/2024 09/04/2025 BLDG 2 Fire Construction Permit There is a total of (4) new wet pipe systems in Building 2. (4) Remote risers will be fed from the lead-in located near Column 6 of Grid A in Building 2. The (4) remote risers in Building 2 are fed by the pump room located in Building 3.