Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.3
Permit Number - TC-COM-0325-00625
Review Name: COMMERCIAL REVIEW - LIMITED v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/24/2025 | Commercial Building | APPROVED | |||
| 10/14/2025 | Commercial Electrical | APPROVED | |||
| 10/17/2025 | Site Engineering | APPROVED | |||
| 10/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/24/2025 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Krista Hansen Planning & Development Services Department – Zoning Review Section PROJECT: TC-COM-0325-00625 7275 S Tucson Bl Unit 165 Replace existing customer service booth in new location (2nd Review) TRANSMITTAL DATE: 10/24/2025 This site is located in the MU zone (UDC 4.7.23). Transportation service: Airport Authority is a permitted use in this zone (UDC Table 4-8-7). See Use Specific Standards 4.9.13.Q.5. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 01. COMMENT: The previous Zoning comment was not addressed: As the proposed new customer service booth alters parking on an existing commercial site, a Development Package (DP) that meets the requirements of the Checklist for Minor Changes to Commercial/Industrial Site is required to be submitted and approved. This DP is a separate submittal from the building plans and must be approved prior to approval of the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. For questions regarding Zoning comments, please contact me at: Krista.Hansen@tucsonaz.gov |
||
| 10/17/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 10/09/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |