Permit Number: TC-COM-0226-00184
Parcel: 123100280

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0226-00184
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/24/2026 Commercial Building Standard APPROVED Building (B) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/16/2026


Structural (S) Reviewer
Madeline Nelson; mnelson@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/21/2026
02/24/2026 Commercial Plumbing Standard APPROVED Plumbing (P) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 2/16/2026
03/05/2026 Site Zoning Standard APPROVED
03/05/2026 Water - PDSD Standard APPROVED
02/23/2026 Outdoor Lighting Standard NOT REQUIRED no modifications to the outdoor lighting.
02/13/2026 Site Engineering Standard NOT REQUIRED
03/05/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/24/2026 Commercial Electrical Standard REQUIRES RESUBMIT Electrical (E) Reviewer
Ron Ross; rross@safebuilt.com
Discipline Status:Denied
Date Completed: 2/14/2026
1.E-702 PARTIAL ONE-LINE DIAGRAM - NEW WORK:Need to provide feeder information for new circuits SF-7, H-7E,
and RF-7 located in MCC M4N-201.
2.E-702 PARTIAL ONE-LINE DIAGRAM - NEW WORK:One-Line (10 fuses) does not match MCC schedule shown on
E-1001 (11 circuits, #5 spare should be H7E, etc.)
3.E-1001 PANELBOARD SCHEDULES:MCC schedule is different from MCC schedule shown on E-702 One-Line.
02/24/2026 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical (M) Reviewer
Jorge Valido; jvalido@safebuilt.com
Discipline Status:Denied
Date Completed: 2/24/2026
1.General -Plan Sheet MD-203. Identify all duct work (SA, EXH, RA) Main and Branch that are going to be removed
and replaced. Add in Key Notes by number (1) Remove duct work (2) Remove VAV. Identify the (19) EXISTING
PNEUMATIC VAV'S IN AREA OUTSIDE OF DESIGNATED SCOPE OF WORK to be replaced by AD alternate. None
of the Duct work symbols on the schedule on Plan Sheet M-001 match Plan Sheet MD-203. - 2018 IECC Section
C103.2Information on construction documents - 2018 IBC Section [A]107.2.1Information on construction documents.
2.General -Plan Sheet M-203. Identify all duct work (SA, EXH, RA) Main and branch. Unable to distinguish what some
of the duct work is and or grills/diffusers. There are square boxes with intermittent lines?? Are those supply grills? Tag
all Supply grills with the type and quantity of CFM. - 2018 IECC Section C103.2Information on construction documents
- 2018 IBC Section [A]107.2.1Information on construction documents.
3.General -Plan Sheet M-203 -TU 7-70 Supply air grill/diffuser CFM quantity is 600 CFM. The ZONE VAV CONTROL
AND BALANCE schedule on Plan Sheet M-901 states for 7-72 Supply air amounts are Max 750 CFM Min 750 CFM.
Confirm Supply air at 7-70. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC Section
[A]107.2.1Information on construction documents.
4.General -Plan Sheet M-203 - TU 7-72 Supply air grill/diffuser CFM quantity is 230 CFM. The ZONE VAV CONTROL
AND BALANCE schedule on Plan Sheet M-901 states for 7-72 Supply air amounts are Max 300 CFM Min 300 CFM.
Confirm Supply air at 7-72. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC Section
[A]107.2.1Information on construction documents.
5.General -Plan Sheet M-203 - TU 7-73 Clarify the duct configuration. Identify the Supply outlets with the CFM
amounts. Confirm they meet the design on the System schedules. - 2018 IECC Section C103.2Information on
construction documents - 2018 IBC Section [A]107.2.1Information on construction documents.
6.General -Plan Sheet M-203 - TU 7-74 Supply air grill/diffuser CFM quantity is 310 CFM. The ZONE VAV CONTROL
AND BALANCE schedule on Plan Sheet M-901 states for 7-72 Supply air amounts are Max 380 CFM Min 380 CFM.
Confirm Supply air at 7-74. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC Section
[A]107.2.1Information on construction documents.
7.General -Plan Sheet M-203 - TU 7-75 Supply air grill/diffuser CFM quantity is 310 CFM. The ZONE VAV CONTROL
AND BALANCE schedule on Plan Sheet M-901 states for 7-72 Supply air amounts are Max 380 CFM Min 380 CFM.
Confirm Supply air at 7-75. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC Section
[A]107.2.1Information on construction documents.
8.General -Plan Sheet M-203 - TU 7-76 Supply air grill/diffuser CFM quantity is 530 CFM. The ZONE VAV CONTROL
AND BALANCE schedule on Plan Sheet M-901 states for 7-72 Supply air amounts are Max 380 CFM Min 380 CFM.
Confirm Supply air at 7-76. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC Section
[A]107.2.1Information on construction documents.
9.General -Plan Sheet M-203 - TU 7-77 Supply air grill/diffuser CFM quantity is 305 CFM. The ZONE VAV CONTROL
AND BALANCE schedule on Plan Sheet M-901 states for 7-72 Supply air amounts are Max 375 CFM Min 375 CFM.
Confirm Supply air at 7-77. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC Section
[A]107.2.1Information on construction documents.
10.General -Plan Sheet M-203 - TU 7-78 Supply air grill/diffuser CFM quantity is 190 CFM. The ZONE VAV CONTROL
AND BALANCE schedule on Plan Sheet M-901 states for 7-72 Supply air amounts are Max 270 CFM Min 270 CFM.
Confirm Supply air at 7-78. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC Section
[A]107.2.1Information on construction documents.
11.General -Confirm CFM amounts at all VAV boxes. I stopped at TU 7-78 on Plan Sheet M-203. See above comments.
Almost all VAV box up to TU 7-78 Supply air CFM amounts do not match the Design Supply Air Flows - MIN and MAX
on the VAV schedules. Confirm all Supply CFM for all VAV meet the specified design on the VAV MIN/MAX
schedules. Additional comments may be generated during a complete and thorough re-review of the submittal. - 2018
IECC Section C103.2Information on construction documents - 2018 IBC Section [A]107.2.1Information on construction
documents.
RESUBMITTAL DIRECTIONS:
•All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the
sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta
identification number, with a brief explanation of the change(s).
•As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete
and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is
required for approval and permitting.
•Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to
each of the noted review comments items.
•This response narrative must clearly address how each issue was corrected or resolved and indicate where the
information may be found within the construction documents. The response narrative must be typewritten, on a
letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may
result in review delays or rejection of the resubmittal.
•Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.)
have been revised according to the above directions. Please resubmit the complete revised plan set with a separate
copy of response narrative PDF through the municipality to complete the review.
•Review of revised construction documents in response to this letter may take upwards of 5 (five) business days,
depending on the size of the project and the volume of plans in queue at time of resubmittal.
03/04/2026 Fire New Construction Standard REVIEW COMPLETED
02/11/2026 PDSD Application Completeness Express REVIEW COMPLETED