Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0225-00339
Parcel: 10709007C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0225-00339
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/04/2025 Commercial Building Standard REQUIRES RESUBMIT April 4, 2025
2nd Review

Light+Path Architects LLC.
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE BUILDING 2 – STAFF LIVING
CORE, SHELL, & FITOUT

City of Tucson Permit Number: TC-COM-0225-00339
Stantec Project Number: 185215066
Stantec File Number: TUC-25-026

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
R-2 V-B 16,332 78 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: None.
Special Inspections: Water resistive barrier coating.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Note on the cover of the drawings that special inspection is required for water-resistive barrier coating [Ref. IBC 2018 Sec. 1705.16.1]. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: The special inspection certificate provided indicates Syndey Palmer as the water-resistive barrier coating special inspector. Sydney Palmer is not included in the Town of Oro Valley approved special inspectors lists that is recognized by the City of Tucson. Please provide someone included on this list. {Terracon does have special inspectors certified in EIFS special inspection that would be acceptable for this special inspection.}

3. Addressed.

Sheet GA111

1. Addressed.

Sheet A111

1. Addressed.

2. Addressed.

3. Addressed.

Sheet A112

1. Addressed.

2. Addressed.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.


PLUMBING COMMENTS

General

1. Addressed.

2. Addressed.

Sheet 202

1. Addressed.

ELECTRICAL COMMENTS

Sheet E511

1. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
04/04/2025 Commercial Electrical Standard REQUIRES RESUBMIT April 4, 2025
2nd Review

Light+Path Architects LLC.
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE BUILDING 2 – STAFF LIVING
CORE, SHELL, & FITOUT

City of Tucson Permit Number: TC-COM-0225-00339
Stantec Project Number: 185215066
Stantec File Number: TUC-25-026

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
R-2 V-B 16,332 78 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: None.
Special Inspections: Water resistive barrier coating.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Note on the cover of the drawings that special inspection is required for water-resistive barrier coating [Ref. IBC 2018 Sec. 1705.16.1]. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: The special inspection certificate provided indicates Syndey Palmer as the water-resistive barrier coating special inspector. Sydney Palmer is not included in the Town of Oro Valley approved special inspectors lists that is recognized by the City of Tucson. Please provide someone included on this list. {Terracon does have special inspectors certified in EIFS special inspection that would be acceptable for this special inspection.}

3. Addressed.

Sheet GA111

1. Addressed.

Sheet A111

1. Addressed.

2. Addressed.

3. Addressed.

Sheet A112

1. Addressed.

2. Addressed.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.


PLUMBING COMMENTS

General

1. Addressed.

2. Addressed.

Sheet 202

1. Addressed.

ELECTRICAL COMMENTS

Sheet E511

1. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
04/04/2025 Commercial Mechanical Standard REQUIRES RESUBMIT April 4, 2025
2nd Review

Light+Path Architects LLC.
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE BUILDING 2 – STAFF LIVING
CORE, SHELL, & FITOUT

City of Tucson Permit Number: TC-COM-0225-00339
Stantec Project Number: 185215066
Stantec File Number: TUC-25-026

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
R-2 V-B 16,332 78 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: None.
Special Inspections: Water resistive barrier coating.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Note on the cover of the drawings that special inspection is required for water-resistive barrier coating [Ref. IBC 2018 Sec. 1705.16.1]. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: The special inspection certificate provided indicates Syndey Palmer as the water-resistive barrier coating special inspector. Sydney Palmer is not included in the Town of Oro Valley approved special inspectors lists that is recognized by the City of Tucson. Please provide someone included on this list. {Terracon does have special inspectors certified in EIFS special inspection that would be acceptable for this special inspection.}

3. Addressed.

Sheet GA111

1. Addressed.

Sheet A111

1. Addressed.

2. Addressed.

3. Addressed.

Sheet A112

1. Addressed.

2. Addressed.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.


PLUMBING COMMENTS

General

1. Addressed.

2. Addressed.

Sheet 202

1. Addressed.

ELECTRICAL COMMENTS

Sheet E511

1. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
04/04/2025 Commercial Plumbing Standard REQUIRES RESUBMIT April 4, 2025
2nd Review

Light+Path Architects LLC.
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE BUILDING 2 – STAFF LIVING
CORE, SHELL, & FITOUT

City of Tucson Permit Number: TC-COM-0225-00339
Stantec Project Number: 185215066
Stantec File Number: TUC-25-026

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
R-2 V-B 16,332 78 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: None.
Special Inspections: Water resistive barrier coating.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Note on the cover of the drawings that special inspection is required for water-resistive barrier coating [Ref. IBC 2018 Sec. 1705.16.1]. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: The special inspection certificate provided indicates Syndey Palmer as the water-resistive barrier coating special inspector. Sydney Palmer is not included in the Town of Oro Valley approved special inspectors lists that is recognized by the City of Tucson. Please provide someone included on this list. {Terracon does have special inspectors certified in EIFS special inspection that would be acceptable for this special inspection.}

3. Addressed.

Sheet GA111

1. Addressed.

Sheet A111

1. Addressed.

2. Addressed.

3. Addressed.

Sheet A112

1. Addressed.

2. Addressed.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.


PLUMBING COMMENTS

General

1. Addressed.

2. Addressed.

Sheet 202

1. Addressed.

ELECTRICAL COMMENTS

Sheet E511

1. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
04/04/2025 Outdoor Lighting Standard REQUIRES RESUBMIT April 4, 2025
2nd Review

Light+Path Architects LLC.
Attn: Brian G. Hagedon
475 S. Gollob Road
Tucson, Arizona 85710

Re: TEEN CHALLENGE BUILDING 2 – STAFF LIVING
CORE, SHELL, & FITOUT

City of Tucson Permit Number: TC-COM-0225-00339
Stantec Project Number: 185215066
Stantec File Number: TUC-25-026

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
R-2 V-B 16,332 78 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: None.
Special Inspections: Water resistive barrier coating.


ARCHITECTURAL COMMENTS

General

1. Addressed.

2. Previous Comment: Note on the cover of the drawings that special inspection is required for water-resistive barrier coating [Ref. IBC 2018 Sec. 1705.16.1]. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. Still Required: The special inspection certificate provided indicates Syndey Palmer as the water-resistive barrier coating special inspector. Sydney Palmer is not included in the Town of Oro Valley approved special inspectors lists that is recognized by the City of Tucson. Please provide someone included on this list. {Terracon does have special inspectors certified in EIFS special inspection that would be acceptable for this special inspection.}

3. Addressed.

Sheet GA111

1. Addressed.

Sheet A111

1. Addressed.

2. Addressed.

3. Addressed.

Sheet A112

1. Addressed.

2. Addressed.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

Sheet M101

1. Addressed.


PLUMBING COMMENTS

General

1. Addressed.

2. Addressed.

Sheet 202

1. Addressed.

ELECTRICAL COMMENTS

Sheet E511

1. Addressed.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
04/02/2025 PDSD Application Completeness Express REVIEW COMPLETED