Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0125-00169
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/17/2025 | Commercial Building Standard | APPROVED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 2/13/2025 12:12:24 PM Building(B) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 2/17/2025 3:52:26 PM |
||
| 02/17/2025 | Commercial Mechanical Standard | APPROVED | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 2/13/2025 1:45:27 PM |
||
| 02/17/2025 | Commercial Plumbing Standard | APPROVED | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 2/17/2025 3:09:43 PM First Plumbing Review: OK |
||
| 02/18/2025 | Site Zoning Standard | APPROVED | |||
| 02/24/2025 | Water - PDSD Standard | APPROVED | |||
| 02/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/17/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 2/4/2025 12:32:18 PM 1. E0.0: Where is Rack B and GC-B located and circuited from (shown in Refrigeration Equipment Schedule). Could not locate anywhere else in the electrical design. 2. E1.0C: Lighting Note: Calls out to refer to sheet E0.1 for mounting heights but this information is not on sheet E0.1 but on sheet E0.0. Comment applies to sheet E1.0D too. Correct or coordinate. 3. E1.0D: Need to provide an interior lighting Comcheck to show lighting design is IECC compliant. Suggest to place comcheck cover sheet on either E1.0C or E1.0D (full report is not required). 4. E1.2D: could not locate Key Notes 2 and 9. 5. E1.2D: Should show wp/GFI receptacle near ‘New Grocery Generator’. 6. E4.0: The circuit breakers to xfmr TLF1 (112.5 KVA) and TFL2 (45 KVA) in panel HF are not properly sized. The 350- amp and 250-amp circuit breakers do not protect the xfmr feeders and xfmr TFL2 is not in compliance with NEC table 450.3(B). Comment only, suggest using protection shown in the feeder schedule. 7. E4.0: Comment only, suggest moving Refrigeration Equipment Schedule to this sheet vs current sheet E0.0. |
||
| 02/17/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 2/4/2025 12:32:18 PM 1. E0.0: Where is Rack B and GC-B located and circuited from (shown in Refrigeration Equipment Schedule). Could not locate anywhere else in the electrical design. 2. E1.0C: Lighting Note: Calls out to refer to sheet E0.1 for mounting heights but this information is not on sheet E0.1 but on sheet E0.0. Comment applies to sheet E1.0D too. Correct or coordinate. 3. E1.0D: Need to provide an interior lighting Comcheck to show lighting design is IECC compliant. Suggest to place comcheck cover sheet on either E1.0C or E1.0D (full report is not required). 4. E1.2D: could not locate Key Notes 2 and 9. 5. E1.2D: Should show wp/GFI receptacle near ‘New Grocery Generator’. 6. E4.0: The circuit breakers to xfmr TLF1 (112.5 KVA) and TFL2 (45 KVA) in panel HF are not properly sized. The 350- amp and 250-amp circuit breakers do not protect the xfmr feeders and xfmr TFL2 is not in compliance with NEC table 450.3(B). Comment only, suggest using protection shown in the feeder schedule. 7. E4.0: Comment only, suggest moving Refrigeration Equipment Schedule to this sheet vs current sheet E0.0. |
||
| 02/05/2025 | Fire New Construction Standard | REVIEW COMPLETED | Fire alarm and fire sprinklers submittal s shall comply with the following codes and standards: 2024 International Fire Code 2022 Edition of NFPA 72 2022 Edition of NFPA 13 |
||
| 01/31/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 02/24/2025 | Site Engineering Standard | REVIEW COMPLETED |