Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM04922
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/09/2024 | Air Balancing/Commissioning Report (Deferred Submittal) | APPROVED | |||
08/20/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/20/2024 | Concrete Installation Inspection (Deferred Submittal) | REQUIRES RESUBMIT | ACTIVITY NO. T22CM02219 & T22CM04992 ADDRESS/PARCEL: (211 N 4TH AV TUCSON, AZ 85705) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: Good Morning Mr. Marek J. Kasztalski and Mr. Greg Keller, RE: Special Inspection Certification/Certificate of Compliance dated July 19, 2024 Project No. 607259001 We are in the process of reviewing your Field Report for the above project. We are now on page 171 of 2,652 and we found the following: 1. Concrete Compressive Strength: We found reports where NO was selected as to whether the specified strength was met. a. An example would be Sample Date 8/2/24 where at 56th day, the strength is 3,120 psi (Specified strength is 4,000 psi). b. Below are the dates we have found so far that also failed: i. 7/8/22 ii. 7/13/22 iii. 7/14/22 iv. 7/29/22 v. 8/2/22 vi. 8/3/22 vii. 8/4/22 viii. 8/5/22 ix. 8/9/22 x. 8/10/22 xi. 8/13/22 2. There are reports that simply are blank with no concrete strength information in them. a. Below are some of the dates: i. 7/31/23 (totally blank) ii. 8/2/23 (three instances of the same report date containing only 7 day strength result) iii. 8/3/23 (totally blank) iv. 8/15/23 (three instances of the same report date containing only 7 day strength result) 3. The City of Tucson would like you to take a fresh look at the Entire report and share with us your assessment as to what direction should be taken. 4. Please coordinate and consult with the Project Structural Engineer of Record and have him/her submit a memo regarding their assessment and suggested solutions. 5. Please respond. 6. ADDITIONAL COMMENT: Fireproofing a. Non-Compliance – report inspection date 01/29/2024 b. Non-Compliance – report inspection date 02/01/2024, contractor not using Isolatek Quik-Set along with Cafco 300 HS as per Manufacturers recommendations. c. Failed minimum bond strength – report inspection date 04/05/02024 d. All bond test failed at adhesion – report inspection date 04/23/2024, contractor did not use Isolatek Quik-Set Accelerator as per Manufacturers recommendations. e. NOTE: the city reviewed a small portion of these fireproofing reports, please take a look at the balance of these category of reports. Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976 |
||
08/20/2024 | Other Inspection Reports (Deferred Submittal) | REQUIRES RESUBMIT | Spray Applied Fireproofing ACTIVITY NO. T22CM02219 & T22CM04992 ADDRESS/PARCEL: (211 N 4TH AV TUCSON, AZ 85705) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: Good Morning Mr. Marek J. Kasztalski and Mr. Greg Keller, RE: Special Inspection Certification/Certificate of Compliance dated July 19, 2024 Project No. 607259001 We are in the process of reviewing your Field Report for the above project. We are now on page 171 of 2,652 and we found the following: 1. Concrete Compressive Strength: We found reports where NO was selected as to whether the specified strength was met. a. An example would be Sample Date 8/2/24 where at 56th day, the strength is 3,120 psi (Specified strength is 4,000 psi). b. Below are the dates we have found so far that also failed: i. 7/8/22 ii. 7/13/22 iii. 7/14/22 iv. 7/29/22 v. 8/2/22 vi. 8/3/22 vii. 8/4/22 viii. 8/5/22 ix. 8/9/22 x. 8/10/22 xi. 8/13/22 2. There are reports that simply are blank with no concrete strength information in them. a. Below are some of the dates: i. 7/31/23 (totally blank) ii. 8/2/23 (three instances of the same report date containing only 7 day strength result) iii. 8/3/23 (totally blank) iv. 8/15/23 (three instances of the same report date containing only 7 day strength result) 3. The City of Tucson would like you to take a fresh look at the Entire report and share with us your assessment as to what direction should be taken. 4. Please coordinate and consult with the Project Structural Engineer of Record and have him/her submit a memo regarding their assessment and suggested solutions. 5. Please respond. 6. ADDITIONAL COMMENT: Fireproofing a. Non-Compliance – report inspection date 01/29/2024 b. Non-Compliance – report inspection date 02/01/2024, contractor not using Isolatek Quik-Set along with Cafco 300 HS as per Manufacturers recommendations. c. Failed minimum bond strength – report inspection date 04/05/02024 d. All bond test failed at adhesion – report inspection date 04/23/2024, contractor did not use Isolatek Quik-Set Accelerator as per Manufacturers recommendations. e. NOTE: the city reviewed a small portion of these fireproofing reports, please take a look at the balance of these category of reports. Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976 |
||
08/20/2024 | Elevator Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
08/20/2024 | Masonry Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
08/20/2024 | Other Inspection Reports (Deferred Submittal) | REVIEW COMPLETED | Co systems Designs | ||
08/08/2024 | PDSD Application Completeness | REVIEW COMPLETED | |||
08/20/2024 | Post-Installed Anchor Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
08/20/2024 | Site Prep Inspection (Deferred Submittal) | REVIEW COMPLETED | |||
08/20/2024 | Welding Inspection (Deferred Submittal) | REVIEW COMPLETED |