Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM03954
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/07/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
10/28/2022 | External Reviewers - Pima County Addressing | REQUIRES RESUBMIT | PLEASE CONTACT PC ADDRESSING BUILDING NUMBER NEEDS TO BE ASSIGNED PRIOR TO ISSUANCE PH# 520-724-9512, ADDRESSING@PIMA.GOV | ||
11/02/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM03954 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1. Provide mechanical plans (IMC2018,106.3.1) Not Complied 2. Provide ventilation calculations (IMC2018,,403.3.1.1.1) Not Complied 3. Provide a detailed narrative on the process that occurs in the warehouse (e.g. what materials are you storing in the warehouse, what type of forklifts are you using in the warehouse is it fuel or electric) (imc2018,106.3.1) Not Complied ELECTRICAL REVIEW COMMENTS Denied 2nd Electrical Review By: Ron Ross PE E1.1 PHOTOMETRIC PLAN: Need to provide an exterior lighting power density calculation per Tucson City requirements. Response: Attached Reviewer: Could not locate in package, please add power density calculation to Sheet E1.1 to avoid errors in upload or reviewer oversight. E4.1 PARTIAL ELECTRICAL POWER - FIRST FLOOR PLAN: 1. Need to provide interior lighting a minimum level ie stumble lighting, emergency lighting, and exit signage. Response: This submittal is for a “Cold Dark Shell”. The requested information will be provided during the Tenant Improvement process once a tenant has been identified. If the building is “shown or toured” after completion the appointments will only be in the daytime and the relights will provide the required stumble lighting Reviewer: If a Certificate of occupancy is needed based upon an electrical permit, you need to provide the minimal level of illumination. Another alternative is to get a variance from a Tucson Code official. Electrical permit will be denied by this third-party reviewer until stumble lighting, emergency egress, and exit lighting are shown on the design. 1. Need to provide an interior lighting comcheck to show compliance to 2018 IECC code. Response: This submittal is for a “Cold Dark Shell”. The requested information will be provided during the Tenant Improvement process once a tenant has been identified. Reviewer: Accepted. 1. Should provide an additional 4-6 receptacles for a Core and Shell design throughout the building. Response: This submittal is for a “Cold Dark Shell”. The requested information will be provided during the Tenant Improvement process once a tenant has been identified. Reviewer: Need to provide service receptacles within 25 feet of any HVAC equipment. This is an NEC requirement (210.63). If mechanical provides HVAC equipment, it must have a service receptacle. E4.2 PARTIAL ELECTRICAL POWER - FIRST FLOOR PLAN: See comments on E4.1. Response: See responses noted above Reviewer: See E4.1 response above PLUMBING REVIEW COMMENTS: Denied Second Plumbing Review: 1). Now that the civil plan has been supplied civil pages 47 & 50 don't correlate with plan page MP3.2 for BLDG 2 water & sewer tie in locations -IPC 106.3.1 2). OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
12/07/2022 | Fire New Construction | REQUIRES RESUBMIT | Comments: Your building will require a fire pump and a fire pump room is required. IBC 913.2.1 Protection of fire pump rooms. Fire pumps shall be located in rooms that are separated from all other areas of the building by a 2-hour fire barriers constructed in accordance with Section 707 or 2-hour horizontal assemblies constructed in accordance with Section 711, or both. Section D103.6.1 Roads 20 to 26 feet in width. Fire lane signs as specified in Section D103.6 shall be posted on both sides of fire apparatus access roads that are 20 to 26 feet wide (6096 to 7925 mm) Section D105.1 Where required. Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet (9144 mm), approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater. Section D105.2 Width. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet (7925 mm), exclusive of shoulders, in the immediate vicinity of the building or portion thereof. Section D105.3 Proximity to building. One or more of required access routes meeting this condition shall be located not less than 15 feet (4572 mm) and not greater than 30 feet (9144 mm) from the building and shall be positioned parallel to one entire side of the building. The side of the building on which the aerial fire apparatus access road is positioned shall be approve by the fire code official. Questions: Jennifer Peel-Davis Tucson Fire Department Fire Plans Examiner Fire Inspector I, II and Fire Alarm Plans Examiner Jennifer.Peel-Davis@Tucsonaz.gov Desk: 520-837-7033 |
||
11/21/2022 | Site Engineering | REQUIRES RESUBMIT | The combo permits cannot be approved until the associated Development Package has been approved. | ||
10/31/2022 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Samuel Rogers Lead Planner PROJECT: T22CM03954 4150 E Los Reales Rd New industrial warehouse building (2nd Review) TRANSMITTAL DATE: October 25, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Zoning has reviewed the building plans for compliance with DP22-0122. Although it appears that the building plan matches the DP, Zoning cannot approve the building plan until the DP is approved. If you have any questions about this transmittal, please contact Samuel Rogers at Samuel.Rogers@tucsonaz.gov |