Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM03953
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/28/2022 | Commercial Plumbing | APPROVED | |||
11/07/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
11/07/2022 | Fire New Construction | PENDING ASSIGNMENT | |||
11/07/2022 | Site Engineering | PENDING ASSIGNMENT | |||
10/28/2022 | External Reviewers - Pima County Addressing | REQUIRES RESUBMIT | {Activity date: 10/18/2022; Status: Reqs Change; Reviewer: CVASQUE2; Title: RESUBMITTAL - TI ALL; Comment: PLEASE CONTACT PC ADDRESSING BUILDING NUMBER NEEDS TO BE ASSIGNED PRIOR TO ISSUANCE PH# 520-724-9512, ADDRESSING@PIMA.GOV} ; {Activity date: 05/24/2022; Status: Reqs Change; Reviewer: VFLORES1; Title: COMMERCIAL - BLDG/FIRE/ZONING/ENG; Comment: PLEASE CONTACT PC ADDRESSING BUILDING NUMBER NEEDS TO BE ASSIGNED PRIOR TO ISSUANCE PH# 520-724-9512, ADDRESSING@PIMA.GOV} | ||
11/02/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM03953 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Conditionally Approved Sheet Cold dark shell (A0.1a) MECHANICAL REVIEW COMMENTS: Conditionally Approved Shell plans approved, will require mechanical plans when a tenant is provided cancel previous corrections. ELECTRICAL REVIEW COMMENTS Denied 2nd Electrical Review By: Ron Ross PE E1.1 PHOTOMETRIC PLAN: Need to provide an exterior lighting power density calculation per Tucson City requirements. Response: Attached Reviewer: Could not locate in package, please add power density calculation to Sheet E1.1 to avoid errors in upload or reviewer oversight. E4.1 PARTIAL ELECTRICAL POWER - FIRST FLOOR PLAN: 1. Need to provide interior lighting a minimum level ie stumble lighting, emergency lighting, and exit signage. Response: This submittal is for a “Cold Dark Shell”. The requested information will be provided during the Tenant Improvement process once a tenant has been identified. If the building is “shown or toured” after completion the appointments will only be in the daytime and the relights will provide the required stumble lighting Reviewer: If a Certificate of occupancy is needed based upon an electrical permit, you need to provide the minimal level of illumination. Another alternative is to get a variance from a Tucson Code official. Electrical permit will be denied by this third-party reviewer until stumble lighting, emergency egress, and exit lighting are shown on the design. 1. Need to provide an interior lighting comcheck to show compliance to 2018 IECC code. Response: This submittal is for a “Cold Dark Shell”. The requested information will be provided during the Tenant Improvement process once a tenant has been identified. Reviewer: Accepted. 1. Should provide an additional 4-6 receptacles for a Core and Shell design throughout the building. Response: This submittal is for a “Cold Dark Shell”. The requested information will be provided during the Tenant Improvement process once a tenant has been identified. Reviewer: Need to provide service receptacles within 25 feet of any HVAC equipment. This is an NEC requirement (210.63). If mechanical provides HVAC equipment, it must have a service receptacle. E4.2 PARTIAL ELECTRICAL POWER - FIRST FLOOR PLAN: See comments on E4.1. Response: See responses noted above Reviewer: See E4.1 response above PLUMBING REVIEW COMMENTS: Denied Second Plumbing Review: 1). SAME- Plumbing Plan pages MP3.3, MP3.4 show 6" roof drains/overflow drains & shows scuppers with downspouts. Plan page A6.2 only shows scupper with downspout detail, Add Roof drain/overflow detail for roof assembly & discharge termination detail to plan page A6.2 -IPC 106.3.1 **Only scupper & Scupper overflow details are shown still no roof drain details.** 2). Now that BLDG A civil plan has been supplied the water & sewer tie in locations don't correlate see civil pages 45 thru 50 & plumbing pages. -IPC 106.3.1 3). OK 4). SAME- Add storm piping material types to plan page MP0.0. -IPC 1102 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
10/31/2022 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Samuel Rogers Lead Planner PROJECT: T22CM03953 4150 E Los Reales Rd New industrial warehouse building (2nd Review) TRANSMITTAL DATE: October 25, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. Zoning has reviewed the building plans for compliance with DP22-0122. Although it appears that the building plan matches the DP, Zoning cannot approve the building plan until the DP is approved. If you have any questions about this transmittal, please contact Samuel Rogers at Samuel.Rogers@tucsonaz.gov |