Permit Details

Status:
Fees Due
Type:
Commercial Building
Apply Date:
05/24/2022
Applicant:
Adam Jones
Description:
NEW INDUSTRIAL WAREHOUSE BUILDING - BUILDING 1

Permit Reviews

Permit Number - T22CM03953
Permit Status: Fees due
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING - BUILDING 1
Start Date Submittal Complete Date Status  
05/24/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/14/2022 COMPLETED Review Details
10/18/2022 RESUBMITTAL - TI ALL 10/18/2022 ACTIVE Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 11/07/2022 REQUIRES RESUBMIT Review Details
01/28/2023 COMMERCIAL REVIEW - FULL v.2 03/02/2023 REQUIRES RESUBMIT Review Details
06/26/2023 RESTAMP - COMMERCIAL v.1 06/28/2023 APPROVED Review Details
06/07/2023 COMMERCIAL REVIEW - FULL v.3 06/26/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM03953
Permit Status: Fees due
Permit Description: NEW INDUSTRIAL WAREHOUSE BUILDING - BUILDING 1
Total Outstanding Activity Conditions - 27
Date Name
02/17/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
02/17/2023 Exterior Building Signage Designs must be submitted and approved prior to final
02/17/2023 High Piled Storage Racking Designs must be submitted and approved prior to final
02/17/2023 Ladder Safety System Design & Support must be submitted and approved prior to final
02/17/2023 Roof Access Ladder/Platform Design and Support Designs must be submitted and approved prior to final
02/17/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/17/2023 Stair Designs must be submitted and approved prior to...
02/17/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
02/17/2023 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
02/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
02/17/2023 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
05/24/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/27/2023 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.
06/28/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
06/28/2023 Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
09/07/2023 This project is within a floodplain and requires an elevation certificate. Submission and Issuance of a Floodplain Use Permit (FUP) is required PRIOR TO ISSUANCE of this permit. An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION. Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
12/09/2022 An intermediate elevation certificate is required before pre-slab inspection