Permit Review Detail
Review Status: Requires Resubmit
Review Details: DEVELOPMENT PACKAGE NEW REVISION v.1
Permit Number - DP22-0122
Review Name: DEVELOPMENT PACKAGE NEW REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/05/2025 | CDRC Post Review Express | PENDING ASSIGNMENT | |||
| 03/18/2025 | Floodplain Administration Review Standard | REQUIRES RESUBMIT | Provide copy of approved CLOMR. An approved CLOMR is required prior to any grading for any phase of this project. Also see comments from PDSD Engineering. Elizabeth Leibold P.E., CPM. CFM Civil Engineer City of Tucson 520-429-4905 elizabeth.leibold@tucsonaz.gov |
||
| 03/14/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. On sheet 7 there appears to be a sidewalk that stops before connecting to the sidewalk on E Los Reales Rd, revise as needed. 2. Make it clear on the plans what drainage infrastructure is going to be constructed with phase 1 to ensure the site functions independent of phase 2. 3. Update or clarify on the SWPPP what erosion control will be put in place covering the phase 2 area and if any disturbance will happen during phase 1 what temporary measures will be put in place to protect against erosion. 4. Indicate on the plans if phase 2 will come in as a separate development package or as a revision to this development package. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 03/27/2025 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: I-10 International – Commercial Storage Development Package (2nd Revision, 1st Review) DP22-0122 – I-2 TRANSMITTAL DATE: March 27, 2025 DUE DATE: April 01, 2025 COMMENTS: Resubmit revised drawings and a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also, compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Section 3.3.3.G.5.c UDC, an applicant has one year from the date of application to obtain approval of a site plan that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A site plan application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. 2-06.4.9 - Information on Proposed Development The following information on the proposed project shall be shown on the drawing or added as notes. 1. COMMENT: 2-06.4.9.G – As you are proposing a phased project provide phased calculation for all applicable calculation, i.e. vehicle & bicycle parking. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised development package as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 01/29/2025 | CDRC Application Completeness Express | REVIEW COMPLETED | |||
| 02/10/2025 | CDRC Review Coordinator Express | REVIEW COMPLETED | External Reviewers not required. No further action is required from the customer at this time. | ||
| 02/05/2025 | OK to Submit - Engineering Fast | REVIEW COMPLETED | |||
| 02/06/2025 | OK to Submit - Zoning Fast | REVIEW COMPLETED | |||
| 05/05/2025 | ROW Engineering Review Standard | REVIEW COMPLETED | DTM Engineering Review was reviewed/approved on revised PIA |