Plan Details

Status:
In review
Type:
Fiber Plan Review
Address:
2762 S KOLB RD

Apply Date:
08/07/2026
Applicant:
Ethan
Description:
Ideatek is Expanding Fiber Optic Cable Network in Tucson. This backbone fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. Scope of work involved: E Stella Rd, S Kolb Rd, E Golf Links Rd, S Sahara Ave, E 22nd St. This plan consists of 7 sections = 7 ROW Fiber permits will be applied for upon approval of this plan.
Architects:
  • Ideatek
  • Ideatek Telcom LLC
Contractors:

Outstanding Plan Activity Conditions

Plan Number - TR-FTTP-0826-00010
Plan Description: Ideatek is Expanding Fiber Optic Cable Network in Tucson. This backbone fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. Scope of work involved: E Stella Rd, S Kolb Rd, E Golf Links Rd, S Sahara Ave, E 22nd St. This plan consists of 7 sections = 7 ROW Fiber permits will be applied for upon approval of this plan.
Date Name Approved Comments
08/28/2026 FLOODPLAIN USE PERMIT (FPUP) Not Approved FPUP is required when applying for a ROW permit for the following areas: 1. On Stella Rd just east of Kolb Rd (Alamo wash) 2. Kolb rd south of Stella rd (Alamo Wash) 3. Escalante Rd (between Prudence Rd & Pantano Rd)
09/04/2026 Conditions for row permit related to plan 432.4 Not Approved 1. Bus stop/ route Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. 2.Constructed watercourse- FPUP needed for this work 3. Other permits in the area (on Sahuara ave)
09/04/2026 These conditions will be on the ROW permit for 432.2 Not Approved 1. Bus stop/ route -Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. 2. Other permits in the area- TR-UTL-0826-01443 TEP @ Sahuara ave 3. crossing Calle Polar is pavement moratorium
09/04/2026 These conditions will be on the ROW permit for 432.3 Not Approved 1. Other permits in the area- TEP (Tucson Electric power is replacing power poles along Sahuara ave) 2. Future bike blvd.- requesting review from the PM 3. This ROW permit requires Floodplain admin review and FPUP on row permit.
09/04/2026 These conditions will be on the ROW permit for 432.1 Not Approved 1. Other permits in the area. 1. There is a CIP project TR-ROW-0626-00668 (HAWK crossing installation) PM Maximino Infante. Pavement moratorium. 2. TR-UTL-0826-01326 TEP removing two poles 3. TR-UTL-0326-00469 boring on east side of Kolb. 2. The following local streets you are crossing are pavement moratorium: Avenida Regulo, Avenida del Sol, & Golf Links circle. 3. Bus/Stop Route in the area. Coordinate with Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. 4. SWBMP (Storm water best management practices) 5. Concrete sidewalks to be restored to PAG SD 200 if damaged. 6. Landscape must be restored to original condition 7. Your designs (boring under wash) requires our Floodplain admin review. Please apply for a floodplain use permit (FPUP)

Plan Reviews

Plan Number - TR-FTTP-0826-00010
Plan Status: In Review
Plan Description: Ideatek is Expanding Fiber Optic Cable Network in Tucson. This backbone fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. Scope of work involved: E Stella Rd, S Kolb Rd, E Golf Links Rd, S Sahara Ave, E 22nd St. This plan consists of 7 sections = 7 ROW Fiber permits will be applied for upon approval of this plan.
Start Date Submittal Complete Date Status  
08/28/2026 Right of Way Review v.1 REQUIRES RESUBMIT Review Details
09/02/2026 Right of Way Review v.2 IN REVIEW Review Details