Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel13623005K
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningO-3
Tucson WardWard 4
Tucson Registered NeighborhoodStella Mann
Major Street & Route

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 2762 S KOLB RD
Date - 11/09/2026 11:30 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-70-66 Vista Del Prado No. 5 3491 3506

Permits

Address: 2762 S KOLB RD
Date - 11/09/2026 11:30 a.m.
Total Number Of Permits - (6)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-1023-02700 Complete 10/13/2023 01/28/2024 Right-of-Way (ROW) - Utility 323027 Site 1 - Install Approximately 168 LF of 8" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collar will be completed on MH 5544-02A per PCRWRD standard detail 211
TR-FBR-0926-00021 On Hold 09/28/2026 N/A Fiber Permit **Waiting on FPUP for Alamo wash on Golf Links** 26-0868 CB-Tucson 955 - S Kolb to E Golf Links Rd To E 22nd St 432.1. SOW: From vault on west side of Kolb & 38th st, bore across Kolb and go north to Golf Links. Cross to north side of Golf Links at Kolb intersection and continue to bor west on the north side of Golf Links to Calle Polar. Ideatek is Expanding Fiber Optic Cable Network in Tucson. This backbone fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. Scope of Work Starts at 2762 S Kolb Rd runs north to Golf Link turns west and ends at approximately at 6509 E Golf Link Rd. Contractor Contact Infor: Roy Charles Mcelhannon 520-808-8338 rc.mcelhannon@2mdirtworks.com
TC-RES-0525-02335 Complete 05/02/2025 11/03/2025 Residential Building - One or Two Family Replace natural gas fuel delivery system in home from meter to fixtures.
T00EX01031 CLOSED 08/01/2000 09/30/2000 EXCAV EXCAV:MANHOLE REPAIRING 10 LF
T20RW01528 FINAL 03/09/2020 04/11/2020 ROW From the TEP NE of 2762 S Kolb Rd, rise down, place 3x3 pothole and place new COX vault, 10' trench heading South to power supply, tie in.
T22RW00495 FINAL 02/11/2022 05/17/2022 ROW N.850063- ALONG N. KOLB RD ACCESS MH 14563 TO SPLICE EXISTING CABLE. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. NOTE: WORK IS EAST OF 2762 S KOLB RD - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY ADDRESS ON APPLICATION - 7050 E GOLF LINKS RD OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 5. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 6. MAINTAIN PEDESTRIAN ACCESS 7. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 8. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813

Plans

Address: 2762 S KOLB RD
Date - 11/09/2026 11:30 a.m.
Total Number Of Plans - (6)
Plan Number Status Application Date Exp Date Unit Type Description
TR-FLA-0226-00004 Approved 02/13/2026 08/14/2026 -- Fiber License Agreement IDEA TEK FTTP and ROW Use Agreement
TR-FTTP-0826-00010 Approved 08/07/2026 02/05/2027 -- Fiber Plan Review Ideatek is Expanding Fiber Optic Cable Network in Tucson. This backbone fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. Scope of work involved: E Stella Rd, S Kolb Rd, E Golf Links Rd, S Sahuara Ave, E 22nd St. This plan consists of 7 sections = 7 ROW Fiber permits will be applied for upon approval of this plan.
TR-FTTP-1126-00037 In Review 11/05/2026 05/06/2027 -- Fiber Plan Review IDEA TEK FTTP and ROW Use Agreement Ideatek is Expanding Fiber Optic Cable Network in Tucson. Ideatek Cabinets will be placed in Tucson Road Right of Way and connect to either First Digital or Ideatek vaults. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vaults are to be placed along route to serve as splicing points. Scope of work involved: S Palo Verde Ave, E Golf Links Rd, and S Harrison Rd This plan consists of 3 sections = 3 ROW Fiber permits will be applied for upon approval of this plan. CB- Tucson 956 Pigtails CB- Tucson 957 Cabinet CB- Tucson 958 Pigtails
TR-FTTP-1126-00038 In Review 11/06/2026 05/07/2027 -- Fiber Plan Review #26-0647 - Tucson - Zone 244 Total Estimated Linear Feet (Excavation/Bore): 9,876 feet Serviceable Locations - 377 Project Scope & Overview Installation of new fiber-optic infrastructure within the City of Tucson public right-of-way (ROW) to support local telecommunications and high-speed broadband expansion. Construction activity includes underground conduit installation, vault/handhole placement, fiber placement, overhead pole attachment where applicable, and site restoration. Detailed Work Plan Underground Excavation & Installation Directional Boring (Trenchless): Placement of high-density polyethylene (HDPE) conduit via horizontal directional drilling (HDD) to minimize surface disruption. Open Trenching / Micro-Trenching: Excavation for conduit installation where directional boring is not feasible. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Pavement Cut Requirements. City of Tucson Structures: Installation of flush-to-grade composite underground vaults and handholes at designated splice locations and lateral tie-ins. Aerial Operations (If Applicable) Attachment of fiber optic cable and strand to existing utility poles in accordance with signed pole attachment agreements and City requirements. No remaining on abandoned poles. City of Tucson Traffic Control & Safety Implementation of temporary traffic control, lane closures, or sidewalk detours in full compliance with the Manual on Uniform Traffic Control Devices (MUTCD), City Code Chapter 25, and approved City of Tucson Department of Transportation & Mobility (DTM) Barricade and Excavation Permits. City of Tucson Utility Coordination & Underground Safety Pre-construction utility locates will be coordinated through Arizona 811. Work occurring near Tucson Water infrastructure will maintain required horizontal clearances and comply with Tucson Water Distribution Design guidelines. Restoration & Site Clean-Up All impacted asphalt, concrete, sidewalks, curbs, ADA ramps, and landscaping will be restored to original or better condition per City of Tucson standard details. Asphalt patches will meet City pavement cut restoration standards. Quantities & Location Details Number of Vaults/Handholes: Service Pedestal - 71 Vault - 18 24" x 36" - 9 36" x 48" - 0 15" x 24" - 9 10” Flower Pot - 8 Project Location/Limits: E 32nd St to E 33rd St and between S Palo Verde Ave to Alvernon Way. This plan consists of 2 permit sections = 2 ROW Fiber permits will be applied for upon approval of this plan. PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
TR-FTTP-1126-00040 In Review 11/06/2026 05/07/2027 -- Fiber Plan Review #26-0649 - Tucson - Zone 246 Total Estimated Linear Feet (Excavation/Bore): 14,661 feet Serviceable Locations - 404 Project Scope & Overview Installation of new fiber-optic infrastructure within the City of Tucson public right-of-way (ROW) to support local telecommunications and high-speed broadband expansion. Construction activity includes underground conduit installation, vault/handhole placement, fiber placement, overhead pole attachment where applicable, and site restoration. Detailed Work Plan Underground Excavation & Installation Directional Boring (Trenchless): Placement of high-density polyethylene (HDPE) conduit via horizontal directional drilling (HDD) to minimize surface disruption. Open Trenching / Micro-Trenching: Excavation for conduit installation where directional boring is not feasible. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Pavement Cut Requirements. City of Tucson Structures: Installation of flush-to-grade composite underground vaults and handholes at designated splice locations and lateral tie-ins. Aerial Operations (If Applicable) Attachment of fiber optic cable and strand to existing utility poles in accordance with signed pole attachment agreements and City requirements. No remaining on abandoned poles. City of Tucson Traffic Control & Safety Implementation of temporary traffic control, lane closures, or sidewalk detours in full compliance with the Manual on Uniform Traffic Control Devices (MUTCD), City Code Chapter 25, and approved City of Tucson Department of Transportation & Mobility (DTM) Barricade and Excavation Permits. City of Tucson Utility Coordination & Underground Safety Pre-construction utility locates will be coordinated through Arizona 811. Work occurring near Tucson Water infrastructure will maintain required horizontal clearances and comply with Tucson Water Distribution Design guidelines. Restoration & Site Clean-Up All impacted asphalt, concrete, sidewalks, curbs, ADA ramps, and landscaping will be restored to original or better condition per City of Tucson standard details. Asphalt patches will meet City pavement cut restoration standards. Quantities & Location Details Number of Vaults/Handholes: Service Pedestal - 96 Vault - 10 24" x 36" - 8 36" x 48" - 0 15" x 24" - 2 10” Flower Pot - 3 Project Location/Limits: E 22nd St to E 29th St and between S Country Club Rd to S Palo Verde Ave. This plan consists of 3 permit sections = 3 ROW Fiber permits will be applied for upon approval of this plan. PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS
TR-FTTP-1126-00042 In Review 11/06/2026 05/07/2027 -- Fiber Plan Review #26-0650 - Tucson - Zone 247 Total Estimated Linear Feet (Excavation/Bore): 18,278 feet Serviceable Locations - 410 Project Scope & Overview Installation of new fiber-optic infrastructure within the City of Tucson public right-of-way (ROW) to support local telecommunications and high-speed broadband expansion. Construction activity includes underground conduit installation, vault/handhole placement, fiber placement, overhead pole attachment where applicable, and site restoration. Detailed Work Plan Underground Excavation & Installation Directional Boring (Trenchless): Placement of high-density polyethylene (HDPE) conduit via horizontal directional drilling (HDD) to minimize surface disruption. Open Trenching / Micro-Trenching: Excavation for conduit installation where directional boring is not feasible. All trenching and backfill will strictly adhere to City of Tucson Chapter 25 Code, Standard Details, and D.S. 3-03 Pavement Cut Requirements. City of Tucson Structures: Installation of flush-to-grade composite underground vaults and handholes at designated splice locations and lateral tie-ins. Aerial Operations (If Applicable) Attachment of fiber optic cable and strand to existing utility poles in accordance with signed pole attachment agreements and City requirements. No remaining on abandoned poles. City of Tucson Traffic Control & Safety Implementation of temporary traffic control, lane closures, or sidewalk detours in full compliance with the Manual on Uniform Traffic Control Devices (MUTCD), City Code Chapter 25, and approved City of Tucson Department of Transportation & Mobility (DTM) Barricade and Excavation Permits. City of Tucson Utility Coordination & Underground Safety Pre-construction utility locates will be coordinated through Arizona 811. Work occurring near Tucson Water infrastructure will maintain required horizontal clearances and comply with Tucson Water Distribution Design guidelines. Restoration & Site Clean-Up All impacted asphalt, concrete, sidewalks, curbs, ADA ramps, and landscaping will be restored to original or better condition per City of Tucson standard details. Asphalt patches will meet City pavement cut restoration standards. Quantities & Location Details Number of Vaults/Handholes: Service Pedestal - 81 Vault - 27 24" x 36" - 10 36" x 48" - 0 15" x 24" - 17 10” Flower Pot - 5 Project Location/Limits: E 29th St to Aviation Road and between S Country Club Rd to S Palo Verde Ave. This plan consists of 4 permit sections = 4 ROW Fiber permits will be applied for upon approval of this plan. PLEASE SEE ATTACHED SITE PLANS AND TCP FOR BETTER DETAILS