Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Activity

 

Plans

Date - 10/12/2026 7:57 a.m.
Total Number Of Plans - 1
Plan Number Status Application Date Expired Date Unit Type Description
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 6 Pre-Application Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed