Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: TE-BAS-0723-00090
Plan Details
Apply Date:
07/19/2023
Applicant:
Steve
Description:
Basin B2, Northwest side of lot, stretches along the west and north sides
Architects:
- Brinkmann Constructors
- EPS Group
- Flint Development
Contractors:
Scheduled Inspections
Plan Number - TE-BAS-0723-00090
Plan Status: Active
Plan Description: Basin B2, Northwest side of lot, stretches along the west and north sides
Total Scheduled Inspections - 1
Scheduled Date | Description | Inspector | Status |
---|---|---|---|
10/07/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Scheduled |
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/24/2023 | COT - BASN - Drainage/Basin - Condition Inspection | Basin - Fair | ||
04/10/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Basin has finally dried out, will continue to monitor after each rain. Work still needs to be done to rectify issues. |