Plan: S15-018
Plan Details
Apply Date:
05/04/2015
Applicant:
Christopher
Description:
MANITOBA DEVELOPEMENT
Architects:
- JE Fuller Hydrology and Geomorphology, Inc.
Contractors:
Outstanding Plan Activity Conditions
Plan Number - S15-018
Plan Description: MANITOBA DEVELOPEMENT
| Date | Name | Approved | Comments |
|---|---|---|---|
| 05/04/2015 | RECEIVED LETTER OF CERTIFICATION | Not Approved |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2018 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 05/10/2018; Status: Approved; Inspector: AH; Comment: Entered by AHINES2 - See acceptance letter in SIRE/PRO.} | |
| 01/09/2019 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 01/09/2019; Status: Approved; Inspector: Rleigh1; Comment: Entered by RLEIGH1 - } | |
| 09/13/2022 | COT - WATR - Design Plan Construction | Passed | {Activity date: 09/13/2022; Status: Approved; Inspector: sharon; Comment: Entered by SBEASLE1 - 09/12/2022 email from Michael Mourreale, Engineering Manager, New Development Tucson Water: "Regarding the MANITOBA DEVELOPMENT S15-018 Tucson Water does not have an acceptance letter for this project because the infrastructure was built in 1973 prior to creating such memos. Because there is no additional infrastructure needed, no water plans would need to be submitted or approved. Finally, because the infrastructure is already part of our water system and the development is within Tucson Water's service area, the developer may purchase and install water meters for the remaining lots at any time."} ; {Activity date: 01/08/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - Ok to release lots 6 and 10, reference Tucson water work orders 5459663 and 5459849 respectively} ; {Activity date: 12/07/2018; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - Lot 1 and 11 ok by Tucson Water. Lot 1 in service since 1980. Lot 11 reference Tucson Water work order 5459476} | |
| 09/14/2022 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 02/08/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE SITE HAS BEEN INSPECTED FOR THE RELEASE OF LOT #3 AT THIS TIME} ; {Activity date: 01/08/2019; Status: Partial Approval; Inspector: JV; Comment: Entered by JVWINKL1 - Ok to release lot 10} ; {Activity date: 01/07/2019; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - OK FOR THE RELEASE OF LOT #6} ; {Activity date: 12/07/2018; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - OK TO RELEASE LOTS #1 & #11.} ; {Activity date: 07/20/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE RELEASE OF LOT #12} ; {Activity date: 05/24/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I DROVE THROUGH THE SITE TO SEE WHAT IS HAPPENING ON SITE AT THIS TIME. CREWS CONTINUE TO WORK ON THE HOME CONSTRUCTION, NONE OF THE SIDEWALKS HAVE BEEN REMOVED AND REPLACED.} ; {Activity date: 05/11/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE INITIAL RELEASES OF LOTS, I HAVE LOOKED AT THE LOTS#4 AND #9 AND THESE APPEAR TO BE OK FOR RELEASE. I HAVE NOTED THAT THE SIDEWALKS IN FRONT OF LOT #4 AND #3 DO APPEAR TO BE OUT OF COMPLIANCE DUE TO EXCEEDING THE MAXIMUM SLOPE. I HAVE ADVISED THE DEVELOPER OF THIS FACT, AND THAT THESE SIDEWALKS ARE WITHIN THE PUBLIC RIGHTS OF WAY AND WILL NEED TO BE CHECKED BY THE TRANSPORTATION DEPARTMENT.} ; {Activity date: 05/23/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK TO RELEASE LOT #9, ALL SIDEWALKS WITHIN THIS SUBDIVISION WILL BE CHECKED AND APPROVED BY THE TRANSPORTATION DEPARTMENT.} ; {Activity date: 05/14/2018; Status: Partial Approval; Inspector: KL; Comment: Entered by KLEE1 - OK for release of LOT 4 per Dave Roberts} |
Plan Reviews
Plan Number - S15-018
Plan Status: Approved
Plan Description: MANITOBA DEVELOPEMENT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/04/2015 | FINAL PLAT - REVIEW | 05/04/2015 | COMPLETED |
| 05/04/2015 | FINAL PLAT - REVIEW | 09/13/2016 | COMPLETED |
| 09/13/2016 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 10/12/2016 | COMPLETED |
| 10/12/2016 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 10/12/2016 | COMPLETED |
| 10/12/2016 | FINAL PLAT - PACKAGE | 10/31/2016 | COMPLETED |