Inspection Status: Passed
Inspection History: COT - WATR - Design Plan Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 09/13/2022 |
COT - WATR - Design Plan Construction |
sharon |
Approved |
Entered by SBEASLE1 - 09/12/2022 email from Michael Mourreale, Engineering Manager, New Development Tucson Water: "Regarding the MANITOBA DEVELOPMENT S15-018 Tucson Water does not have an acceptance letter for this project because the infrastructure was built in 1973 prior to creating such memos. Because there is no additional infrastructure needed, no water plans would need to be submitted or approved. Finally, because the infrastructure is already part of our water system and the development is within Tucson Water's service area, the developer may purchase and install water meters for the remaining lots at any time." |
| 01/08/2019 |
COT - WATR - Design Plan Construction |
JV |
Partial Approval |
Entered by JVWINKL1 - Ok to release lots 6 and 10, reference Tucson water work orders 5459663 and 5459849 respectively |
| 12/07/2018 |
COT - WATR - Design Plan Construction |
JV |
Partial Approval |
Entered by JVWINKL1 - Lot 1 and 11 ok by Tucson Water. Lot 1 in service since 1980. Lot 11 reference Tucson Water work order 5459476 |