Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan: S08-135
Plan Details
Apply Date:
12/01/2008
Applicant:
Unknown
Description:
MOUNTAIN VAIL ESTATES,PHASE II
Architects:
- City of Tucson DTM Streets and Traffic Maintenance
- DIAMOND VENTURES INC
- FIDELITY NATIONAL TITLE AGENCY
- Richmond American Homes of AZ, Inc.
- WTHOMPSON
Contractors:
Outstanding Plan Activity Conditions
Plan Number - S08-135
Plan Description: MOUNTAIN VAIL ESTATES,PHASE II
Date | Name | Approved | Comments |
---|---|---|---|
12/01/2008 | RECEIVED LETTER OF CERTIFICATION | Not Approved |
Outstanding Inspections
Permit Status:
Permit Number:
Permite Description:
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/31/2018 | COT - ENGR - Site - Assurance Release | Partial Pass | {Activity date: 01/31/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE IS ON GOING AND WILL REMAIN AT A PARTIAL TILL ALL OTHER INSPECTIONS HAVE BEEN COMPLETED ON THIS SITE.} ; {Activity date: 03/23/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTACTED SEAN RICH AND ADVISED HIM THAT WE WILL RELEASE PART "C" LOTS 184 - 200 AND LOTS 203 - 215, AND PART "F" LOTS 323 - 338 AND LOTS 346 - 385. LOTS 201-202, AND 339-340 ARE NOT CALLED OUT IN THE CLEARANCE LETTERS BY EITHER THE ADEQ OR PIMA COUNTY WASTE WATER.} ; {Activity date: 10/05/2010; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT2 - LOTS 136-141, 157-175, AND PORTIONS OF COMMON AREAS B&C CAN BE RELEASED FROM THIS ASSURANCE AT THIS TIME PER THE ACCOMPANING NEW DEED FOR SAID PROPERTIES. ALL OTHER AREAS ARE TO BE HELD UNTIL A RE-INSPECTION OF THE SITE HAS BEEN DONE AND A ACCEPTANCE OF DISCHARGE HAS BEEN PROVIDED BY PIMA COUNTY WASTE WATER.} |
Completed Inspections
Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/05/2013 | SPECIAL INSPECTION - Pima County Sewer (Third Party) | Passed | {Activity date: 12/05/2013; Status: Approved; Inspector: FGALINDO; Comment: Entered by KMEDINA1 - LOTS 323-338 AND 346-384 SEE SIRE} ; {Activity date: 12/04/2013; Status: Approved; Inspector: FGALINDO; Comment: Entered by KMEDINA1 - LOTS 184-215 SEE SIRE} |
|
04/05/2017 | COT - WATR - Design Plan Construction | Passed | {Activity date: 04/05/2017; Status: Approved; Inspector: PB; Comment: Entered by PBAUGHM1 - Water Approval Letter uploaded to SIRE.} ; {Activity date: 03/17/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I HAVE RECIEVED THE RELEASE LETTERS FROM ADEQ FOR THE ACCEPTANCE OF THE FOLLOWING: PHASE 4 LOTS 184 - 200 AND LOTS203 - 215, AND PHASE 7 FOR LOTS 323 - 340 AND LOTS 346 - 385. THESE LETTERS ARE DATED FOR ACCEPTANCE ON NOVEMBER 1, 2013 AND SIGNED BY RAYMOND D. MORGAN P.E..} | |
02/22/2018 | TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) | Passed | {Activity date: 02/22/2018; Status: Approved; Inspector: RLEIGH; Comment: Entered by RLEIGH1 - } ; {Activity date: 03/17/2015; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PARTIAL APPROVAL FOR PART "C" LOTS 184 - 215 AND PART "F" LOTS 323 - 338, & LOTS 346 - 384} |
Plan Reviews
Plan Number - S08-135
Plan Status: Approved
Plan Description: MOUNTAIN VAIL ESTATES,PHASE II
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/26/2009 | RESUBMITTAL - CDRC - FINAL PLAT REVIEW | 03/23/2009 | COMPLETED |
01/27/2009 | ASSURANCES | 02/10/2009 | COMPLETED |
03/24/2009 | FINAL PLAT PACKAGE | 03/30/2009 | COMPLETED |
04/08/2009 | FINAL PLAT PACKAGE | 04/10/2009 | COMPLETED |
12/01/2008 | FINAL PLAT REVIEW | 01/14/2009 | COMPLETED |