Inspection Status: Passed
Inspection History: COT - WATR - Design Plan Construction
| Date |
Description |
Inspector |
Results |
Comments |
| 04/05/2017 |
COT - WATR - Design Plan Construction |
PB |
Approved |
Entered by PBAUGHM1 - Water Approval Letter uploaded to SIRE. |
| 03/17/2015 |
COT - WATR - Design Plan Construction |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - I HAVE RECIEVED THE RELEASE LETTERS FROM ADEQ FOR THE ACCEPTANCE OF THE FOLLOWING: PHASE 4 LOTS 184 - 200 AND LOTS203 - 215, AND PHASE 7 FOR LOTS 323 - 340 AND LOTS 346 - 385. THESE LETTERS ARE DATED FOR ACCEPTANCE ON NOVEMBER 1, 2013 AND SIGNED BY RAYMOND D. MORGAN P.E.. |