Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Details

Status:
Approved
Type:
Land Division
Apply Date:
02/20/2004
Applicant:
N/A
Description:
PASEO ESTRELLA

Completed Inspections

Permit Status:
Permit Number:
Permit Description:
Total Completed Inspections - 4
Date Description Inspector Results Comments
12/04/2005 SPECIAL INSPECTION - Pima County Sewer (Third Party) Passed {Activity date: 12/04/2005; Status: Approved; Inspector: SRAVAL; Comment: Entered by THAUSER1 - G-2004-106}
12/30/2005 COT - WATR - Design Plan Construction Passed {Activity date: 12/30/2005; Status: Approved; Inspector: LHERNAND; Comment: Entered by THAUSER1 - 2-089-131-2004}
09/25/2008 COT - ENGR - Site - Assurance Release Passed {Activity date: 09/25/2008; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT2 - } ; {Activity date: 07/07/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - SEE PREVIOUSCOMMENTS, AND COMPLETE THE GRADING INSPECTION FOR GRADING PERMIT #T04BU00863.} ; {Activity date: 04/04/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS RECHECKED AND THE FOLLOWING ITEMS FROM THE PREVIOUS LIST HAVE BEEN FOUND TO BE COMPLETE AT THIS TIME.

1) COMPLETE THE COMMON AREA "C-1" WEST OF LOT #93, THIS WILL INCLUDE LANDSCAPE AS WELL AS ANY OTHER ITETO BE PLACED IN THIS ARE FOR PUBLIC USE.
1A) THE WALL WEST OF LOT #104 HAS BEEN CONSTRUCTED BUT NOT COMPLETED.
2) WALL SECTIONS HAVE NOT BEEN COMPLETED IN THE COMMON AREAS NORTH OF LOT #94 AND WEST OF LOT #104. ADVISE ME IF THESE AREAS ARE TO RECEIVE ANY TYPE OF WALLS OR GATES PRIOR TO THE FINAL ACCEPTANCE.
3) COMPLETE THE WALL WEST OF LOTS #72 & #73 AND ALONG THE EAST SIDE OF THE SUBDIVISION SOUTH OF STAR PASS BOULEVARD.
3A) THE WALLS WEST OF LOTS #72 AND #73 HAVE BEEN COMPLETED.
4) PONDING WATER HAS BEEN NOTED IN ALL WATER HARVESTING AND RETENTION/DETENTION BASINS LOCATED IN THE SOUTHERN SECTION OF THIS SUBDIVISION. THE COMMON AREAS HAVE ALSO NOT BEEN COMPLETED AT THIS TIME SOUTH OF STARR PASS BOULEVARD, A BOND WILL BE REQUIRED FOR THIS REMAINING WORK.
5) PROVIDE A BASIN CERTIFICATION LETTER PRIOR TO THE FINAL RELEASE OF ALL OF THE ASSURANCES.
6) A COMPLETION BOND FOR THE FOLLOWING LOTS WILL BE REQUIRED TO COVER FOR ALL OF THE REMAINING SIDEWALKS AND DRIVESWAYS: 7-9, 12, 14, 19, 23, 24-35, 42-44, AND 72-75.
7) GENERAL CLEANUP OF THE SITE IS REQUIRED PRIOR TO THE FINAL RELEASE. THE FINAL GRADING INSPECTION FOR THIS SITE STILL NEEDS TO BE PERFORMED PRIOR TO THE FINAL RELEASE OF ALL ASSURANCES AND BONDS ATTACHED TO THIS SITE.
8) AN AREA OF PROPERTY ALONG THE EAST SIDE OF THE SOUTHERN HALF OF THIS PROJECT HAS BEEN DISTURBED AND WILL REQUIRE THAT SOME MIDIGATION TAKE PLACE PRIOR TO THE FINAL RELEASE OF THIS SITE. CONTACT JOSEPH LINVILLE WITH THE ZONING DEPARTMENT AND ARRANGE TO MEET WITH HIM IN REGARDS TO THIS MATTER TO DECIDE WHAT WILL BE REQUIRED PRIOR TO FINALIZATION.} ; {Activity date: 03/15/2006; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE SITE WAS CHECKED AND THE FOLLOWING INDEFICIENCIES WERE FOUND:
1) COMPLETE THE COMMON AREA "C-1" WEST OF LOT #93, THIS WILL INCLUDE LANDSCAPE AS WELL AS ANY OTHER ITETO BE PLACED IN THIS ARE FOR PUBLIC USE.
2) WALL SECTIONS HAVE NOT BEEN COMPLETED I9N THE COMMON AREAS NORTH OF LOT #94 AND WEST OF LOT #104. ADVISE ME IF THESE AREAS ARE TO RECEIVE ANY TYPE OF WALLS OR GATES PRIOR TO THE FINAL ACCEPTANCE.
3) COMPLETE THE WALL WEST OF LOTS #72 & #73 AND ALONG THE EAST SIDE OF THE SUBDIVISION SOUTH OF STAR PASS BOULEVARD.
4) PONDING WATER HAS BEEN NOTED IN ALL WATER HARVESTING AND RETENTION/DETENTION BASINS LOCATED IN THE SOUTHERN SECTION OF THIS SUBDIVISION.
5) PROVIDE A BASIN CERTIFICATION LETTER PRIOR TO THE FINAL RELEASE OF ALL OF THE ASSURANCES.
6) A COMPLETION BOND FOR THE FOLLOWING LOTS WILL BE REQUIRED TO COVER FOR ALL OF THE REMAINING SIDEWALKS AND DRIVESWAYS: 7-9, 12, 14, 19, 23, 24-35, 42-44, AND 72-75.
7) GENERAL CLEANUP OF THE SITE IS REQUIRED PRIOR TO THE FINAL RELEASE. THE FINAL GRADING INSPECTION FOR THIS SITE STILL NEEDS TO BE PERFORMED PRIOR TO THE FINAL RELEASE OF ALL ASSURANCES AND BONDS ATTACHED TO THIS SITE.
8) AN AREA OF PROPERTY ALONG THE EAST SIDE OF THE SOUTHERN HALF OF THIS PROJECT HAS BEEN DISTURBED AND WILL REQUIRE THAT SOME MIDIGATION TAKE PLACE PRIOR TO THE FINAL RELEASE OF THIS SITE. CONTACT JOSEPH LINVILLE WITH THE ZONING DEPARTMENT AND ARRANGE TO MEET WITH HIM IN REGARDS TO THIS MATTER TO DECIDE WHAT WILL BE REQUIRED PRIOR TO FINALIZATION.} ; {Activity date: 12/29/2005; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - THE ROADWAYS, UTILITIES, CURBS, AND COMMON AREAS HAVE BEEN COMPLETED AT THIS TIME. THE FOLLOWING LOTS HAVE BEEN COMPLETED INCLUDING THE REQUIRED SIDE WALKS AND DRIVEWAYS:1&2, 20-22,66-71, 76-104, ALL OTHER LOTS WILL BE REQUIRED TO HAVE A COMPLETION BOND PLACED AGAINST THEM PRIOR TO A FINAL RELEASE. THE COMMON AREAS HAVE BEEN COMPLETED TO A ROUGHENED STATE AT THIS TIME, ADDITIONAL WORK WILL BE REQUIRED PRIOR TO THE FINAL RELEASE OF ALL BONDS.} ; {Activity date: 11/22/2005; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT2 - SITE NOT READY AT THIS TIME, PAVEMENT NOT INSTALLED BETWEEN 22ND STREET AND THE SUBDIVISION.} ; {Activity date: 12/21/2005; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT2 - I LOOKED AT THE SITE TO SEE IF THE WORK PREVIOUSLY DISCUSSED WITH THE DEVELOPER HAS BEEN COMPLETED AT THIS TIME. THE WORK THAT IS REQUIRED FOR THE INITIAL RELEASES OF THE LOTS HAS BEEN COMPLETED AT THIS TIME. A FUTURE INSPECTION WILL BE REQUIRED FOR THIS SITE ONCE THE PERCENTAGE OF LOTS RELEASED REACHES 75%. A PUNCHLIST WILL BE PREPARED ON THE NEXT INSPECTION REQUEST ONCE ADDITIONAL WORK HAS BEEN COMPLETED ON THIS SITE.}
10/23/2008 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed {Activity date: 10/23/2008; Status: Approved; Inspector: TSTOCKET; Comment: Entered by THAUSER1 - I-2004-073 & D-2005-008}

Plan Reviews

Plan Number - S04-016
Plan Status: Approved
Plan Description: PASEO ESTRELLA
Start Date Submittal Complete Date Status  
02/10/2005 CDRC - FINAL PLAT PACKAGE 03/22/2005 COMPLETED Review Details
02/10/2005 CDRC - ASSURANCES 02/25/2005 COMPLETED Review Details
02/20/2004 TENTATIVE PLAT REVIEW 03/24/2004 COMPLETED Review Details
04/20/2004 RESUBMITTAL - TENTATIVE PLAT REVIEW 05/19/2004 COMPLETED Review Details
06/22/2004 RESUBMITTAL - TENTATIVE PLAT REVIEW 07/07/2004 COMPLETED Review Details
07/12/2004 FINAL PLAT REVIEW 08/12/2004 COMPLETED Review Details
07/13/2004 ASSURANCES 08/04/2004 COMPLETED Review Details
12/27/2004 RESUBMITTAL - FINAL PLAT REVIEW 01/13/2005 COMPLETED Review Details
12/27/2004 ASSURANCES 01/25/2005 COMPLETED Review Details

Documents

File Name Document Type  
FINAL_01.TIFF PLATS VIEW
FINAL_02.TIFF PLATS VIEW
FINAL_03.TIFF PLATS VIEW
FINAL_04.TIFF PLATS VIEW
TENTATIVE_01.TIF PLATS VIEW
TENTATIVE_02.TIF PLATS VIEW
TENTATIVE_03.TIF PLATS VIEW
LANDSCAPE_04.TIF PLATS VIEW
LANDSCAPE_05.TIF PLATS VIEW
LANDSCAPE_06.TIF PLATS VIEW
LANDSCAPE_07.TIF PLATS VIEW
LANDSCAPE_NPP_01.TIF PLATS VIEW
LANDSCAPE_NPP_02.TIF PLATS VIEW
LANDSCAPE_NPP_03.TIF PLATS VIEW
ZONING_REVIEW.XLS PLATS VIEW
ZONING_REVIEW1.TIF PLATS VIEW
ZONING_REVIEW2.TIF PLATS VIEW