Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Plan Number: S04-016
Parcel: Unknown

Review Status: Completed

Review Details: ASSURANCES

Plan Number - S04-016
Review Name: ASSURANCES
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/13/2004 MARILYN KALTHOFF START ASSURANCES RECEIVED Completed
07/13/2004 MATT FLICK ENGINEERING FOR ASSIGNMENT Completed 2 unsigned drafts received to Elizabeth on 13JUL04.
07/13/2004 MATT FLICK ENGINEERING FOR ASSIGNMENT Completed DATE: August 4, 2004
TO: Craig Gross; CDRC Coordinator
SUBJECT: Paseo Estrella Final Plat Engineering Review
REVIEWER: Loren Makus
ACTIVITY NUMBER: S04-016


SUMMARY: The Final Plat has been reviewed by Development Services Department Engineering Division. We do not recommend approval of the Final Plat at this time.

1. DS Sec.2-03.6.4.I: The drainage report describes common area "C-4" as a detention basin. Show retention/detention areas in a surveyable and readily retraceable manner. The 100-year ponding limits of the basins shall be labeled with surveyable data. Council has directed us to require separate common area designations for retention/detention basins. The basin area, labeled as Common Areas "C-4" "Recreation Area" on the Final Plat, needs clarification. In the Title Block, the common area descriptions and the basin area need to be differentiated; label the basin area as "RETENTION / DETENTION BASIN".
2. The CC&R's shall describe retention/detention basin maintenance. Revise the CC&R's to clarify drainage and basin maintenance per DS Sections 10-02.14.3.2 & 3.
3. DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved.
a) Provide copy of sample Warranty Deed.
b) Provide a copy of the original Trust and a current title report.
c) DS Sec.2-03.6.5.B: Assure that any and all easements listed in the forthcoming title report are labeled on the plat.
d) For this and future projects, please provide two 8½" by 11" location map sheets for assurance submittals that go to Mayor & Council.
e) Assure that the descriptions of the common areas on the plat and in the descriptions in the Final Plat title block match the CC&R's descriptions of the subdivision common areas and the descriptions in the assurance paperwork.
If you have any questions call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov.
Loren Makus, EIT
Senior Engineering Associate
Engineering Division
Development Services
08/04/2004 SUE MONTES CDRC STAFF ASSURANCES RECEIVED Denied
08/04/2004 LOREN MAKUS ENGINEERING REVIEW Denied 2 unsigned drafts received to Elizabeth on 13JUL04.
08/04/2004 LMAKUS1 CDRC STAFF CITY ATTORNEY'S OFFICE Denied
08/04/2004 LOREN MAKUS ENGINEERING REVIEW Denied DATE: August 4, 2004
TO: Craig Gross; CDRC Coordinator
SUBJECT: Paseo Estrella Final Plat Engineering Review
REVIEWER: Loren Makus
ACTIVITY NUMBER: S04-016


SUMMARY: The Final Plat has been reviewed by Development Services Department Engineering Division. We do not recommend approval of the Final Plat at this time.

1. DS Sec.2-03.6.4.I: The drainage report describes common area "C-4" as a detention basin. Show retention/detention areas in a surveyable and readily retraceable manner. The 100-year ponding limits of the basins shall be labeled with surveyable data. Council has directed us to require separate common area designations for retention/detention basins. The basin area, labeled as Common Areas "C-4" "Recreation Area" on the Final Plat, needs clarification. In the Title Block, the common area descriptions and the basin area need to be differentiated; label the basin area as "RETENTION / DETENTION BASIN".
2. The CC&R's shall describe retention/detention basin maintenance. Revise the CC&R's to clarify drainage and basin maintenance per DS Sections 10-02.14.3.2 & 3.
3. DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until the financial assurances are approved.
a) Provide copy of sample Warranty Deed.
b) Provide a copy of the original Trust and a current title report.
c) DS Sec.2-03.6.5.B: Assure that any and all easements listed in the forthcoming title report are labeled on the plat.
d) For this and future projects, please provide two 8½" by 11" location map sheets for assurance submittals that go to Mayor & Council.
e) Assure that the descriptions of the common areas on the plat and in the descriptions in the Final Plat title block match the CC&R's descriptions of the subdivision common areas and the descriptions in the assurance paperwork.
If you have any questions call me at 791-5550, extension 1161 or email me at loren.makus@tucsonaz.gov.
Loren Makus, EIT
Senior Engineering Associate
Engineering Division
Development Services