Plan: CIP-0324-00005
Plan Details
Apply Date:
03/06/2024
Applicant:
Tucson Water
Description:
Corona De Tucson Reservoir and Booster Station
Architects:
- Cobre Building Systems Inc.
- Tucson Water
- Tucson Water Planning & Engineering
- WestLand Engineering and Environmental Services, Inc.
Contractors:
Outstanding Plan Activity Conditions
Plan Number - CIP-0324-00005
Plan Description: Corona De Tucson Reservoir and Booster Station
| Date | Name | Approved | Comments |
|---|---|---|---|
| 01/23/2026 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | Not Approved | |
| 01/23/2026 | An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | Not Approved | https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf |
| 02/04/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | Not Approved | |
| 02/04/2026 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | Not Approved | |
| 02/04/2026 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. (SUBMIT FABRICATOR'S CERTIFICATE OF COMPLIANCE OR SPECIAL INSPECTION REPORT TO RESOLVE) | Not Approved | |
| 02/04/2026 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | Not Approved | |
| 02/04/2026 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. | Not Approved | |
| 02/04/2026 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | Not Approved | |
| 02/04/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | Not Approved | |
| 02/04/2026 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. | Not Approved | |
| 04/16/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | Not Approved | Type,Size and Placement of Reinforcing Steel |
| 10/30/2025 | WATER STERILIZATION REPORT IS REQUIRED. | Not Approved |
Plan Reviews
Plan Number - CIP-0324-00005
Plan Status: In Review
Plan Description: Corona De Tucson Reservoir and Booster Station
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/22/2024 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
| 01/20/2026 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
| 02/07/2025 | CIP - Dev Site + Comm Structure - Final v.2 | APPROVED | |
| 07/11/2024 | CIP - Dev Site + Comm Structure - Final v.2 | APPROVED | |
| 10/16/2025 | CIP - Dev Site + Comm Structure - Interim v.1 | APPROVED | |
| 03/06/2024 | CIP - Project Manager Review v.1 | APPROVED | |
| 01/14/2025 | CIP - Dev Site + Comm Structure - Final v.1 | REQUIRES RESUBMIT | |
| 04/04/2024 | CIP - Dev Site + Comm Structure - Initial v.1 | REQUIRES RESUBMIT | |
| 03/16/2026 | CIP - Dev Site + Comm Structure - Final v.1 | APPROVED |