Plan Details

Status:
In review
Type:
Capital Improvement Project
Apply Date:
03/06/2024
Applicant:
Tucson Water
Description:
Corona De Tucson Reservoir and Booster Station
Architects:
  • Cobre Building Systems Inc.
  • Tucson Water
  • Tucson Water Planning & Engineering
  • WestLand Engineering and Environmental Services, Inc.
Contractors:

Outstanding Plan Activity Conditions

Plan Number - CIP-0324-00005
Plan Description: Corona De Tucson Reservoir and Booster Station
Date Name Approved Comments
01/23/2026 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. Not Approved
01/23/2026 An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. Not Approved https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf
02/04/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. Not Approved
02/04/2026 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. Not Approved
02/04/2026 SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. (SUBMIT FABRICATOR'S CERTIFICATE OF COMPLIANCE OR SPECIAL INSPECTION REPORT TO RESOLVE) Not Approved
02/04/2026 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. Not Approved
02/04/2026 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. Not Approved
02/04/2026 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. Not Approved
02/04/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. Not Approved
02/04/2026 SPECIAL INSPECTION FOR WELDING IS REQUIRED. Not Approved
04/16/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. Not Approved Type,Size and Placement of Reinforcing Steel
10/30/2025 WATER STERILIZATION REPORT IS REQUIRED. Not Approved

Plan Reviews

Plan Number - CIP-0324-00005
Plan Status: In Review
Plan Description: Corona De Tucson Reservoir and Booster Station
Start Date Submittal Complete Date Status  
05/22/2024 CIP - Dev Site + Comm Structure - Final v.1 REQUIRES RESUBMIT Review Details
01/20/2026 CIP - Dev Site + Comm Structure - Final v.1 REQUIRES RESUBMIT Review Details
02/07/2025 CIP - Dev Site + Comm Structure - Final v.2 APPROVED Review Details
07/11/2024 CIP - Dev Site + Comm Structure - Final v.2 APPROVED Review Details
10/16/2025 CIP - Dev Site + Comm Structure - Interim v.1 APPROVED Review Details
03/06/2024 CIP - Project Manager Review v.1 APPROVED Review Details
01/14/2025 CIP - Dev Site + Comm Structure - Final v.1 REQUIRES RESUBMIT Review Details
04/04/2024 CIP - Dev Site + Comm Structure - Initial v.1 REQUIRES RESUBMIT Review Details
03/16/2026 CIP - Dev Site + Comm Structure - Final v.1 APPROVED Review Details

Documents

File Name Document Type  
CONS-STORAGE TANK STRUCTURAL CALCULATIONS AND SHOP DRAWINGS_V1.PDF DOCUMENTS VIEW
FINAL REVIEW NARRATIVE_V1.PDF DOCUMENTS VIEW
FINAL REVIEW V2 NARRATIVE_V2.PDF DOCUMENTS VIEW
GEOTECH_607319002 R GEOTECH EVAL ADDENDUM NO. 1_V1.PDF DOCUMENTS VIEW
GEOTECH_NINYO-MOORE GEOTECH RPT_9-9-2022_V1.PDF DOCUMENTS VIEW
NPPO PLANS_20221107_10298-NP-SHEET-SET_V1.PDF DOCUMENTS VIEW
NPPO SIGNED LETTER_V1.PDF DOCUMENTS VIEW
OLD VAIL ELECTRICAL 60 07082024_V2.PDF DOCUMENTS VIEW
OLD VAIL FOR TW PERMIT, CIVIL, STRUCT, ELEC_WL 10860 (1-8-25)_V3.PDF DOCUMENTS VIEW
OLD VAIL PHASE 2 75 DRAWINGS COMBINED _ 6.20.2025K_V1.PDF DOCUMENTS VIEW
OLDVAIL_FLOODPLAIN_EVALUATION_SUMMARY_12-4-2024_V2.PDF DOCUMENTS VIEW
OLDVAIL_FLOODPLAIN_EVALUATION_SUMMARY_V1.PDF DOCUMENTS VIEW
PJW932 OLD VAIL RESERVOIR - BOOSTER PUMP STATION IMPROVEMENTS (W EXISTING ELECTRICAL 60)_V1.PDF DOCUMENTS VIEW
PJW932 PERMIT NARRATIVE, BUILDING PERMIT PHASE I, CORONA DE TUCSON COMMERCIAL STRUCTURE PERMIT_V3.PDF DOCUMENTS VIEW
10860 60 SUBMITTAL SET (2-26-24)_V1.PDF DOCUMENTS VIEW