Plan Number: CIP-0324-00005
Parcel: 30509006D

Review Status: Requires Resubmit

Review Details: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1

Plan Number - CIP-0324-00005
Review Name: CIP - DEV SITE + COMM STRUCTURE - INITIAL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
NPPO APPROVED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: OLD VAIL RESERVOIR AND BOOSTER PUMP STATION IMPROVEMENTS
ACTIVITY NO: CIP-0324-00005
ADDRESS: 11210 E OLD VAIL RD

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.

COMMENTS:
1. The NPPO was previously approved during the grading permit approval of TD-DEV-1223-00491.

If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov
Real Estate NOT REQUIRED
Signs NOT REQUIRED RE: signage review - information
For: water well and reservoir site
AT: 11210 E Old Vail Road
Sign permit: CIP-0324-00005
Reviewer: Heather Thrall (Heather.Thrall@tucsonaz.gov)
Date: 4/16/24

Codes applicable to signs include: Unified Development Code (UDC, 7A, Sign Standards), National Electrical Code (NEC), Tucson - Pima County Outdoor Lighting Code (OLC), International Building Code (IBC)

1. UDC:
A) No signs were shown in the package, the following is provided for information for planning of incidental / informational signage only:
B) Detached or attached signs should be non-illuminated, shall be a maximum sign area of 12 square feet, a maximum height of 10’ above grade to top of sign, be contained on site. Such signs may be reflective in nature. Position them to be a minimum of 5 feet from fire hydrants, 2 feet from access drives.
C) Please be advised that for permanent signs identifying the site, valued at over $1000.00, or are illuminated, their installation would be done via a licensed sign contractor. The contractor would submit plans for review (including all construction specifications and diagrams), with resulting permit issued for the installation.

Please feel free to email me for any signage questions at any location, or for other permanent, prominent signs (Heather.Thrall@tucsonaz.gov)
TSMR/PDMR - Engineering NOT REQUIRED
Zoning Administration NOT REQUIRED City of Tucson Zoning standards do not apply to proposals within Pima County jurisdiction.
Zoning Compliance Review NOT REQUIRED City of Tucson Zoning standards do not apply to proposals within Pima County jurisdiction.
Zoning Modifications - DDO NOT REQUIRED City of Tucson Zoning standards do not apply to proposals within Pima County jurisdiction.
Zoning Modifications - IPP NOT REQUIRED City of Tucson Zoning standards do not apply to proposals within Pima County jurisdiction.
Zoning Modifications - MS&R NOT REQUIRED City of Tucson Zoning standards do not apply to proposals within Pima County jurisdiction.
Zoning Modifications - Variance NOT REQUIRED City of Tucson Zoning standards do not apply to proposals within Pima County jurisdiction.
Bldg Permits - Post Review Express PENDING ASSIGNMENT
CDRC Post Review Express PENDING ASSIGNMENT
External Reviewers - Tucson Electric Power (TEP) REQUIRES RESUBMIT April 29, 2024
WO#T111752
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: Old Vail Reservoir & Booster Pump Station Improvements
CIP-0324-00005
Tucson Electric Power Company (TEP) has reviewed and cannot approve the
development plan submitted 4/17/2024. There are existing facilities within the
development which are not depicted upon the plan; specifically TEP transformer and
underground primary cable. Please revise and resubmit; further, please add existing
land right covering aformentioned items recorded under instrument #20123190157.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our land Resources Department,
TEPDEVREV@tep.com.
Should you have any technical questions, please contact the area designer,
Cruz Vega
(520) 349-9850
cruzvega@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
Building Official REVIEW COMPLETED
Commercial Building REVIEW COMPLETED Please submit your revised documents along with a detailed response letter, which states how all Building Review Section comments were addressed.
1. Provide Geotechnical Evaluation NO. 607319001 prepared by Ninyo & Moore with next submittal IBC 107.2.7
2. Provide Structural calculations with next submittal prepared by Arizona licensed professional. IBC 107.2.7

Mark Masek
Plans Examiner
Mark.masek@tucsonaz.gov
520-837-4994
Commercial Electrical REVIEW COMPLETED No Electrical plans submitted at this review session.
Commercial Mechanical REVIEW COMPLETED
Commercial Plumbing REVIEW COMPLETED
Entitlements REVIEW COMPLETED Special Exception not required.
Fire New Construction REVIEW COMPLETED
Historic REVIEW COMPLETED It appears that there are 2 known sites crossing the proposed work location--AZ AA:12:875(ASM) and AZ AA 12:928 (ASM). The bulk of the work area has not been surveyed. Historic would recommend that the entire area is surveyed (Class III Survey). Please submit a Cultural Resources Clearance form and Historic staff can request an estimate from an on-call archaeologist. Questions? Jodie.Brown@tucsonaz.gov
New Services/JOC REVIEW COMPLETED CIP-0324-00005 - CIP - Dev Site + Comm Structure - Initial v1 - 11210 E OLD VAIL RD

There are no New Development projects located in this immediate area.

Tucson Water’s New Development Section has:
a) No objections to, or comments on, the initial submittal.
b) No recommendations for the Project Manager.

All subsequent submittals should be routed to Tucson Water’s Planning & Engineering staff for review.

Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov
ROW Engineering Review REVIEW COMPLETED No Comments
Not City ROW

David Stiffey
David.Stiffey@tucsonaz.gov
Site Engineering REVIEW COMPLETED 1. Include the SWPPP plan from the rough grading permit for this project on the next submittal.
2. Provide a drainage report that shows how this project is meeting balanced basin detention requirements per Chapter 3 of The Design Standards for Stormwater Detention and Retention manual (DSSDR) which can be found online at:
https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
3. Include in the drainage report how this project is meeting first flush retention requirements per Chapter 2 of the DSSDR.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: OLD VAIL RESERVOIR AND BOOSTER PUMP STATION IMPROVEMENTS
ACTIVITY NO: CIP-0324-00005
ADDRESS: 11210 E OLD VAIL RD

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all Landscape/NPPO Review Section comments are addressed.

COMMENTS:
1. The NPPO was previously approved during the grading permit approval of TD-DEV-1223-00491.
2. Please provide a mitigation planting plan for the protected native plants per the previously approved development package NPPO (TD-DEV-1223-00491).

If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov
Site Zoning REVIEW COMPLETED CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Nathan Herrera
Lead Planner

PROJECT:
Tucson Water Capital Improvement Project (1st Review)
CIP-0324-00005

TRANSMITTAL DATE: April 18, 2024


COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-06. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

1. COMMENT: Zoning acknowledges that the proposed development is located unincorporated Pima County and has no comments related to zoning.

2. COMMENT: Development must comply with the Administrative Manual Section 2-06 - Development Package.



If you have any questions about this transmittal, please contact me at Nathan.Herrera@tucsonaz.gov or at 520-837-4894.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: revised Development Package along with a detailed response letter, which states how all Zoning Review Section comments were addressed. To resubmit visit Tucson Development Center at https://tdc-online.tucsonaz.gov/#/home. Instructions for resubmittal - https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf.
Storm to Shade Review REVIEW COMPLETED No Comments from Storm to Shade
Traffic Engineering Review REVIEW COMPLETED No Comments
Not City ROW

David Stiffey
David.Stiffey@tucsonaz.gov
TSMR/PDMR - Zoning REVIEW COMPLETED
Water - PDSD REVIEW COMPLETED