Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Zoning Permit Annual
Apply Date:
09/16/2025
Applicant:
John Bauer
Description:
Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.

Permit Reviews

Permit Number - TZ-PMT-0925-00094
Permit Status: Issued
Permit Description: Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
Start Date Submittal Complete Date Status  
09/18/2025 ZONING PERMIT REVIEW v.1 09/22/2025 APPROVED Review Details

Documents

File Name Document Type  
COFT - PDSD - TEMPORARY USE PERMIT.PDF DOCUMENTS VIEW
TAA PCCP BATCH PLANT SITE PLAN ALT 1_V1.PDF DOCUMENTS VIEW