Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Activity

 

Parcel Attributes

Parcel140490010
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningI-2
Airport Environs Zone

Tucson International AEZ Paddle

Tucson WardWard 5
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 12/07/2025 4:04 a.m.
Number Of Permits - (16)
Permit Status Apply Date Expired Date Unit Type Description
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 801 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 809 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 810 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 811 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 811T Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 814 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 816 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 817 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 819 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 829 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 830 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 833 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG 837 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG M04 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.
TZ-PMT-0925-00094 Issued 09/16/2025 09/28/2026 BLDG M05 Zoning Permit Annual Installation of concrete batch plant to include a washout area and location for Material stock plies. This will be utilized in the construction of a new runway for the Tucson Airport Authority. Batch Plant is expected to be placed in November 2025 and completion of concrete placement is expected in March of 2026 at which point the batch plant will be disassembled and removed. TAA is also reviewing the site plan for conformance to the policies required for them.

Documents

File Name Document Type  
COFT - PDSD - TEMPORARY USE PERMIT.PDF DOCUMENTS VIEW
TAA PCCP BATCH PLANT SITE PLAN ALT 1_V1.PDF DOCUMENTS VIEW