Permit: TW-CONS-0326-0014
Permit Details
Status:
Inspections
Type:
TW CIP Planning & Engineering
Address:
4795 S CONTRACTORS WY
Address NEW:
4795 S CONTRACTORS WY
Apply Date:
03/28/2026
Applicant:
Andres Amado
Description:
Contractors Way 8-in Main Replacement Illinois to Sundt Booster. Project is in Construction at the time of entry into EPL.
Outstanding Inspections
Permit Status: Inspections
Permit Number: TW-CONS-0326-0014
Permite Description: Contractors Way 8-in Main Replacement Illinois to Sundt Booster.
Project is in Construction at the time of entry into EPL.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2026 | Used to track and report system pressure testing and associated water loss. | N/A | In Field Accepted | I started pressure test at 200 psi from 10:30 AM to 12:30 PM. Pressure test passed and had zero loss. |
| 10/16/2026 | TWPE Summary review of Daily Field Inspections | N/A | In Field Accepted | No work was completed this week. Southwest gas is working on a project at their reg station. |
| 10/23/2026 | TWPE Daily Field Inspection | N/A | In Field Accepted | action completed the fourth air relief valve and framed base for concrete. Action will pour concrete next week around arv and gate valve risers. |
Scheduled Inspections
Scheduled Inspections - TW-CONS-0326-0014
Status: Inspections
Description: Contractors Way 8-in Main Replacement Illinois to Sundt Booster.
Project is in Construction at the time of entry into EPL.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 11/23/2026 | TWPE Daily Field Inspection | Scheduled | |
| 11/23/2026 | TWPE Summary review of Daily Field Inspections | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.