Inspection Status: In Field Accepted

Inspection History: TWPE Summary review of Daily Field Inspections

Date Description Inspector Results Comments
05/06/2026 TWPE Summary review of Daily Field Inspections In Field Accepted
05/28/2026 TWPE Summary review of Daily Field Inspections In Field Accepted Action laid pipe to station 114+0.
07/24/2026 TWPE Summary review of Daily Field Inspections In Field Accepted Action didn’t work this week. kinder morgan and swg are working on their line.
07/31/2026 TWPE Summary review of Daily Field Inspections In Field Accepted ACTION installed two services at stations 112+78.56. one was a ARV and one was a service.
08/14/2026 TWPE Summary review of Daily Field Inspections In Field Accepted Action completed pressure test on 8/13/26. Line tested at 200 psi from 1030-1230 and passed. There was zero loss. Action will prep for high cl2 test on 8/17/2026 at 0900.
TWPE Summary review of Daily Field Inspections Scheduled