Permit: TS-PRM-0624-00274
Permit Details
Apply Date:
06/14/2024
Applicant:
Victoria Boardman
Description:
*Revision #1 (monument sign relocated) started 8/23/24* Install (1) non illuminated building sign, (2) illuminated wall signs and (1) illuminated ground sign
Permit Reviews
Permit Number - TS-PRM-0624-00274
Permit Status: Issued
Permit Description: *Revision #1 (monument sign relocated) started 8/23/24* Install (1) non illuminated building sign, (2) illuminated wall signs and (1) illuminated ground sign
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/11/2024 | PERMANENT SIGN REVIEW v.2 | 07/31/2024 | REQUIRES RESUBMIT |
| 06/14/2024 | PERMANENT SIGN REVIEW v.1 | 06/21/2024 | REQUIRES RESUBMIT |
| 08/23/2024 | PERMANENT SIGN REVIEW v.1 | 08/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TS-PRM-0624-00274
Permit Status: Issued
Permit Description: *Revision #1 (monument sign relocated) started 8/23/24* Install (1) non illuminated building sign, (2) illuminated wall signs and (1) illuminated ground sign
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 01/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 07/31/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
Completed Inspections
Permit Status: Issued
Permit Number: TS-PRM-0624-00274
Permit Description: *Revision #1 (monument sign relocated) started 8/23/24* Install (1) non illuminated building sign, (2) illuminated wall signs and (1) illuminated ground sign
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2024 | COT - ENGR - Sign Footing and Excavation | Passed | Sign excavation has passed okay to continue. Set backs meet or exceed requirements and are good. Landscaping will have to be repaired and area of disturbance re hydro seeded at completion of project. |