Permit: TR-UTL-0726-01117
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
3517 N KELLEN CANYON CT
Address NEW:
3517 N KELLEN CANYON CT
Apply Date:
07/07/2026
Applicant:
Garcia David
Description:
MMR Fiber-- SEGMENT 3 (Plan Phase 3) - THIS JOB PLACES 5100' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINEERING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE. (DTM Note-- Refer to Attachments for Related Permit from Contractor)
Permit Reviews
Permit Number - TR-UTL-0726-01117
Permit Status: Needs resubmittal
Permit Description: MMR Fiber-- SEGMENT 3 (Plan Phase 3) - THIS JOB PLACES 5100' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINEERING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE. (DTM Note-- Refer to Attachments for Related Permit from Contractor)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 07/20/2026 | REQUIRES RESUBMIT |
| 07/08/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | REQUIRES RESUBMIT |