Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Search

Parcel Attributes

Parcel103083080
JurisdictionTucson, Pima County
City of Tucson ZoningR-1
Tucson WardWard 3
Flood Related InformationFEMA Floodplain Area
Major Street & Route

Scenic Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 3517 N KELLEN CANYON CT
Date - 09/22/2026 3:02 p.m.
Total Number Of Annexations & Original City Zoning (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045
C9-81-02 Goret - Silverbell 5278 5392

Rezoning Cases

Date - 09/22/2026 3:02 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-72-85 City of Tucson - Sewer Farm P-I Withdrawn 09/15/2011

Permits

Address: 3517 N KELLEN CANYON CT
Date - 09/22/2026 3:02 p.m.
Total Number Of Permits - (2)
Permit Status Apply Date Expired Date Unit Type Description
TR-UTL-0726-01117 Needs Resubmittal 07/07/2026 N/A Right-of-Way (ROW) - Utility MMR Fiber-- SEGMENT 3 (Plan Phase 3) - THIS JOB PLACES 5100' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINEERING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE. (DTM Note-- Refer to Attachments for Related Permit from Contractor)
TR-UTL-0726-01118 Needs Resubmittal 07/07/2026 N/A Right-of-Way (ROW) - Utility BICENTEL - SEGMENT 3 (Phase 3) - THIS JOB PLACES 5100' 2' OF (2)2" AND (4)7-WAY HDPE CONDUITS ALONG N SILVERBELL RD. METHOD OF CONSTRUCTION TO BE DIRECTIONAL BORING AND/OR DIGGING/TRENCHING DEPENDING ON AREA AND ENGINERRING DRAWINGS. POSSIBLE PITS AND PLACING HANDHOLES. FIBER CABLE TO BE PLACED IN CONDUIT LOOPING INTO HANDHOLE.