Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
4885 S HOUGHTON RD
Apply Date:
04/01/2025
Applicant:
Fernando Soto
Description:
CONTINUATION OF PERMIT # TR-UTL-0924-01834 Crews will be boring and trenching in pavement/dirt. Approximately 4,078' in dirt, and approx. 2,891' in pavement to relocate gas service. THIS PROJECT INVOLVES THE RELOCATION OF EXISTING GAS FACILITIES IN ORDER TO ALLEVIATE CONFLICTS ASSOCIATED WITH CITY OF TUCSON HOUGHTON ROAD RECONSTRUCTION PROJECT FROM IRVINGTON TO 22ND. 10/24/2024 - Revised traffic control set up approved for 24 hour set up. 6/10/2025- renew for 90 days as of 6/7/25

Permit Reviews

Permit Number - TR-UTL-0425-00538
Permit Status: Complete
Permit Description: CONTINUATION OF PERMIT # TR-UTL-0924-01834 Crews will be boring and trenching in pavement/dirt. Approximately 4,078' in dirt, and approx. 2,891' in pavement to relocate gas service. THIS PROJECT INVOLVES THE RELOCATION OF EXISTING GAS FACILITIES IN ORDER TO ALLEVIATE CONFLICTS ASSOCIATED WITH CITY OF TUCSON HOUGHTON ROAD RECONSTRUCTION PROJECT FROM IRVINGTON TO 22ND. 10/24/2024 - Revised traffic control set up approved for 24 hour set up. 6/10/2025- renew for 90 days as of 6/7/25
Start Date Submittal Complete Date Status  
04/01/2025 RIGHT-OF-WAY REVIEW v.1 04/03/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0425-00538
Permit Status: Complete
Permit Description: CONTINUATION OF PERMIT # TR-UTL-0924-01834 Crews will be boring and trenching in pavement/dirt. Approximately 4,078' in dirt, and approx. 2,891' in pavement to relocate gas service. THIS PROJECT INVOLVES THE RELOCATION OF EXISTING GAS FACILITIES IN ORDER TO ALLEVIATE CONFLICTS ASSOCIATED WITH CITY OF TUCSON HOUGHTON ROAD RECONSTRUCTION PROJECT FROM IRVINGTON TO 22ND. 10/24/2024 - Revised traffic control set up approved for 24 hour set up. 6/10/2025- renew for 90 days as of 6/7/25
Total Outstanding Activity Conditions - 2
Date Name
04/01/2025 Traffic control set-up approved between 9AM - 3:30PM
04/01/2025 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0425-00538
Permit Description: CONTINUATION OF PERMIT # TR-UTL-0924-01834 Crews will be boring and trenching in pavement/dirt. Approximately 4,078' in dirt, and approx. 2,891' in pavement to relocate gas service. THIS PROJECT INVOLVES THE RELOCATION OF EXISTING GAS FACILITIES IN ORDER TO ALLEVIATE CONFLICTS ASSOCIATED WITH CITY OF TUCSON HOUGHTON ROAD RECONSTRUCTION PROJECT FROM IRVINGTON TO 22ND. 10/24/2024 - Revised traffic control set up approved for 24 hour set up. 6/10/2025- renew for 90 days as of 6/7/25
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/09/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed This permit is a continuation of a previous permit TR-UTL-0924-01834. No new pre-activity meeting was held.
06/09/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Contractor is using full depth CLSM for backfill in the paved areas. Contractor is using hot mix for the permanent patches but are not being required to perform by the book repairs to the asphalt due to the reconstruction of Houghton Rd.
09/09/2025 TRSP - ROW - Final Passed This permit is a continuation of a previous permit TR-UTL-0924-01834. The work on these permits has been completed. SWG is continuing its pipe relocation under a different permit now TR-UTL-0425-00587

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW