Inspection History Details
Inspection Status: Re-inspection required
Inspection History: TRSP - ROW - Final
Permit Number - TR-UTL-0425-00538
Inspection Description - TRSP - ROW - Final
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2025 | TRSP - ROW - Final | Re-inspection required | The work on this permit is a continuation of a previous expired permit TR-UTL-0924-01834. The work is not complete and both permits are now expired. A new permit will need to be opened to continue or finish work. | |
| 09/09/2025 | TRSP - ROW - Final | Passed | This permit is a continuation of a previous permit TR-UTL-0924-01834. The work on these permits has been completed. SWG is continuing its pipe relocation under a different permit now TR-UTL-0425-00587 |