Permit: TR-UTL-0425-00538

Parcel: 13632011G


Addresses:

4885 S HOUGHTON RD

Inspection Status: Passed

Inspection History: TRSP - ROW - Backfill - Placement/Compaction

Date Description Inspector Results Comments
06/09/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Contractor is using full depth CLSM for backfill in the paved areas. Contractor is using hot mix for the permanent patches but are not being required to perform by the book repairs to the asphalt due to the reconstruction of Houghton Rd.