Permit: TD-DEV-1222-00078
Permit Details
Status:
Complete
Type:
Development Package
Address:
3233 E SPEEDWAY BL
Address NEW:
3233 E SPEEDWAY BL
Apply Date:
12/13/2022
Applicant:
Dave Loew
Description:
*Revision #2 Started 9/27/24, Revision #1 started 4/15/2024 (building, EV parking, pedestrian access)* Connection of 2 existing building with new building
Permit Reviews
Permit Number - TD-DEV-1222-00078
Permit Status: Complete
Permit Description: *Revision #2 Started 9/27/24, Revision #1 started 4/15/2024 (building, EV parking, pedestrian access)* Connection of 2 existing building with new building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/15/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 01/26/2023 | REQUIRES RESUBMIT |
| 09/27/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 10/29/2024 | APPROVED |
| 05/17/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 06/02/2023 | APPROVED |
| 08/05/2025 | AS-BUILT v.1 | 08/06/2025 | APPROVED |
| 04/15/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 05/20/2024 | APPROVED |
| 03/15/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 03/22/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1222-00078
Permite Description: *Revision #2 Started 9/27/24, Revision #1 started 4/15/2024 (building, EV parking, pedestrian access)* Connection of 2 existing building with new building
Total Outstanding Inspections - 1
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1222-00078
Permit Description: *Revision #2 Started 9/27/24, Revision #1 started 4/15/2024 (building, EV parking, pedestrian access)* Connection of 2 existing building with new building
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Held PreCon with Steven Zadorozny/Barker Contracting, Ernie Stephen’s/ CoT, Matthew Carlton/Cot. Informed Super that site work falls under DP and to schedule appropriate inspections. 1St should be flat work for sidewalk in phase 1. | |
| 05/19/2025 | Passed | Contractors good to pour the sidewalk | ||
| 12/30/2025 | Passed | Contractor needs to add hand railing on the exit on the north side exceeds the 5% On the east exit of the theater the downspout needs to run into the parking lot area not onto the exit asphalt area |
||
| 12/30/2025 | SITE - Zoning Final | Passed | ||
| 08/20/2026 | COT - ENGR - Signage Final | Passed | ||
| 09/21/2026 | ENGR Engineering Final | Passed | ||
| 09/21/2026 | Passed |