Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2026 | ENGR Engineering Final | Not Ready | Sidewalk cross slope and running slope under screen of outdoor theater does not comply, it is steeper than 5% so it effectively becomes a ramp and needs hand rail on both sides. landing at the top of this ramp also does not comply. One of the entryway landings from the box office/lobby does not comply. This needs to have the automatic door opening hardware removed and the entryway that does comply needs to have handicap symbols so that it is readily identified as the dedicated handicap door. Additional sidewalk can be poured to bypass the non-compliant landing here. | |
| 12/30/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to add hand railing on the exit on the north side exceeds the 5% On the east exit of the theater the downspout needs to run into the parking lot area not onto the exit asphalt area |