Restricted Record - Revision 2 started 11/13/24 - Revision 1 - Proposed Contractor Storage stalls of varying sizes with paved drive aisles and security fence surrounding the site

Permit Reviews

Permit Number - TD-DEV-1222-00077
Permit Status: Inspections
Permit Description: Restricted Record - Revision 2 started 11/13/24 - Revision 1 - Proposed Contractor Storage stalls of varying sizes with paved drive aisles and security fence surrounding the site
Start Date Submittal Complete Date Status  
11/13/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 12/06/2024 APPROVED Review Details
03/01/2024 DEVELOPMENT PACKAGE NEW v.1 05/02/2024 REQUIRES RESUBMIT Review Details
05/23/2024 DEVELOPMENT PACKAGE NEW v.2 07/19/2024 APPROVED Review Details
10/03/2024 DEVELOPMENT PACKAGE REVIEW v.1 10/22/2024 APPROVED Review Details
12/15/2022 DEVELOPMENT PACKAGE REVIEW v.1 01/26/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-1222-00077
Permit Status: Inspections
Permit Description: Restricted Record - Revision 2 started 11/13/24 - Revision 1 - Proposed Contractor Storage stalls of varying sizes with paved drive aisles and security fence surrounding the site
Total Outstanding Activity Conditions - 1
Date Name
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1222-00077
Permite Description: Restricted Record - Revision 2 started 11/13/24 - Revision 1 - Proposed Contractor Storage stalls of varying sizes with paved drive aisles and security fence surrounding the site
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
09/20/2024 SITE - Stormwater Follow-up N/A Failed Silt fence has failed in several areas at perimeter of the fence line, repair and recall
09/20/2024 SITE - SWPPP Correction Notice N/A Failed
09/20/2024 NPPO Pre-Construction N/A Failed See notes attached
09/20/2024 Verify required native plant protection, relocation, removal is completed prior to activity on job site N/A Failed
09/20/2024 PDSD Engineering Division Pre-Construction SITE N/A Failed See notes attached
11/06/2024 Consultation SITE N/A Canceled
11/13/2024 SITE N/A Canceled
11/15/2024 COT - ENGR - Stormwater N/A Partial Pass Drainage pipe on the west end of lot good to backfill. 11/15/24
11/27/2024 ENGR - Drainage Structures N/A Partial Pass okay to pour type 4 CB floors
02/19/2025 N/A Partial Pass Approach for refuse enclosure
01/29/2025 ENGR Paving N/A Partial Pass Compaction completed on north and west roads meet or exceed specs at 100% compaction/ 01/29/25.
01/29/2025 ENGR Grading Final N/A Partial Pass Finial grade in roadways has started, north and west road meeting compaction test of 100% +.
02/24/2025 COT - FCON - Fire - Final N/A Partial Pass Ok for tco level 4. Need to place signs were fire hydrants are due to the fact their hidden. Need a key switch on gate when its installed for the fire department.
09/20/2024 PDSD Site/Engineering Division - NPPO N/A Partial Pass See notes attached

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-1222-00077
Permit Description: Restricted Record - Revision 2 started 11/13/24 - Revision 1 - Proposed Contractor Storage stalls of varying sizes with paved drive aisles and security fence surrounding the site
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/22/2024 SITE - Stormwater Setup and Controls Passed
12/17/2024 ENGR - Drainage Structures Passed
02/24/2025 ENGR Paving Passed
02/24/2025 ENGR Grading Final Passed All compaction results have been submitted and seen on site meeting all the criteria asked for or exceeding. Sidewalks are all within compliance.
03/18/2025 PDSD Site/Engineering Division - Landscaping Passed Plant count meets plan specs. Everything in good shape and intent of the plan has been met.
03/14/2025 Final inspection to ensure all landscape and water harvesting SITE Passed Water harvesting has been completed for some time now and completed to plan specs.
03/14/2025 PDSD Site/Engineering Division - NPPO Passed NPPO seams to be in good shape and watered, plants have been moved back to the new locations. All plantings meet the required numbers prior to the nursery being established.
03/14/2025 SITE - Stormwater Final Inspection Passed Notice of termination has been submitted
03/27/2025 For trash and recycling enclosures Passed Passed
04/23/2025 ENGR Engineering Final Passed Fencing contractors are finishing putting the last of the razor wire on the individual lot gates and will be done by end of day. Final cleaning of waste building materials is happening now. Sire is clean. Dumpster on site is scheduled for removal by Monday. All other aspects of engineering final have been met. Ron will verify.