Inspection Status: Canceled

Inspection History: ENGR Paving

Date Description Inspector Results Comments
01/15/2025 ENGR Paving Canceled
01/16/2025 ENGR Paving Partial Pass AB recycled asphalt being used, will relook at all roads when completed.
01/29/2025 ENGR Paving Partial Pass Compaction completed on north and west roads meet or exceed specs at 100% compaction/ 01/29/25.
01/30/2025 ENGR Paving Partial Pass Compaction test results are over and above what's required. Will return on 01/31/25 for more observations on asphalt placement
01/31/2025 ENGR Paving Partial Pass need test results from asphalt and milling will still need to be tested in storage areas.
02/24/2025 ENGR Paving Passed