Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/14/2025 |
ENGR Engineering Final
|
|
Not Ready |
Once all gates are completed in 1st phase and refuse enclosure is completed I can release the 1st 2 rows of the 1st phase. |
| 03/18/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Partial pass on first row only, 03/18/25. |
| 04/04/2025 |
ENGR Engineering Final
|
|
Partial Pass |
04/04/25, Partial pass on the first two rows only. The rest of the facility needs to be gated off while fence construction is still going on. |
| 04/23/2025 |
ENGR Engineering Final
|
|
Passed |
Fencing contractors are finishing putting the last of the razor wire on the individual lot gates and will be done by end of day. Final cleaning of waste building materials is happening now. Sire is clean. Dumpster on site is scheduled for removal by Monday. All other aspects of engineering final have been met. Ron will verify. |