Permit: TD-DEV-1125-00283
Permit Details
Apply Date:
11/11/2025
Applicant:
Dennis Caldwell
Description:
Rev 1 - update to paving/parking started 03.10.2026 ** A combination of existing parcel APN 113-01-050A & the expansion parcel APN 113-01-0420 into one development.
Permit Reviews
Permit Number - TD-DEV-1125-00283
Permit Status: Complete
Permit Description: Rev 1 - update to paving/parking started 03.10.2026 ** A combination of existing parcel APN 113-01-050A & the expansion parcel APN 113-01-0420 into one development.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/10/2026 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 03/11/2026 | APPROVED |
| 11/12/2025 | DEVELOPMENT PACKAGE NEW v.1 | 11/12/2025 | REQUIRES RESUBMIT |
| 12/01/2025 | DEVELOPMENT PACKAGE NEW v.2 | 12/12/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1125-00283
Permite Description: Rev 1 - update to paving/parking started 03.10.2026 ** A combination of existing parcel APN 113-01-050A & the expansion parcel APN 113-01-0420 into one development.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | Consultation SITE | N/A | Partial Pass | 2/2/26 Met with project manager and Dylan Molina to work out Accessible route ramp. Dylan will Okay plan if cross slopes are acceptable. I will let Project manager know what the design outcome is |
| 01/28/2026 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | Caldwell Watza Superintendant: Christopher Arlig Christopher@caldwellwatza.com 520 697 4947 Development plan needs to be drawn with accessible route detailed to show elevations and ramp and or curb ramp details so that it can be built to plan and comply with ICC 117.1 2009. The concrete drainage swale that crosses the access aisle across the PAAL also needs to be addressed. Revise the drawings and resubmit to the portal. Reschedule pre-con when ready. |
| 04/02/2026 | ENGR Engineering Final | N/A | Not Ready | One sidewalk panel is over 5% running slope on the north side of the crosswalk. Fix this and reschedule inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1125-00283
Permit Description: Rev 1 - update to paving/parking started 03.10.2026 ** A combination of existing parcel APN 113-01-050A & the expansion parcel APN 113-01-0420 into one development.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2026 | Consultation SITE | Passed | Reviewed forms for ramp and speed table. okayed to pour - spot check slopes during finishing | |
| 04/02/2026 | SITE - Zoning Final | Passed | ||
| 04/02/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 04/14/2026 | ENGR Engineering Final | Passed |