Inspection History Details
Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | Consultation SITE | Partial Pass | 2/2/26 Met with project manager and Dylan Molina to work out Accessible route ramp. Dylan will Okay plan if cross slopes are acceptable. I will let Project manager know what the design outcome is |
|
| 03/09/2026 | Consultation SITE | Partial Pass | Discussed elevation issue and ramps. Commented that a speed table/raised crosswalk could be used to allow standard curb ramp adjacent to basketball court. Attaching COT Detail 220 for reference. Leaving this inspection as partial pass so that further consultations can be requested if necessary. | |
| 03/27/2026 | Consultation SITE | Passed | Reviewed forms for ramp and speed table. okayed to pour - spot check slopes during finishing |