Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2026 | PDSD Engineering Division Pre-Construction SITE | Not Ready | Caldwell Watza Superintendant: Christopher Arlig Christopher@caldwellwatza.com 520 697 4947 Development plan needs to be drawn with accessible route detailed to show elevations and ramp and or curb ramp details so that it can be built to plan and comply with ICC 117.1 2009. The concrete drainage swale that crosses the access aisle across the PAAL also needs to be addressed. Revise the drawings and resubmit to the portal. Reschedule pre-con when ready. |
|
| 04/02/2026 | PDSD Engineering Division Pre-Construction SITE | Passed |