Permit Details

Status:
Inspections
Type:
Development Package
Apply Date:
09/23/2024
Applicant:
Catherine Atchley
Description:
Proposed development of new Circle K fueling canopy and convenience store.

Permit Reviews

Permit Number - TD-DEV-0924-00264
Permit Status: Inspections
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
Start Date Submittal Complete Date Status  
09/24/2024 DEVELOPMENT PACKAGE NEW v.1 11/13/2024 REQUIRES RESUBMIT Review Details
02/18/2025 DEVELOPMENT PACKAGE NEW v.4 02/20/2025 APPROVED Review Details
12/03/2024 DEVELOPMENT PACKAGE NEW v.2 01/21/2025 REQUIRES RESUBMIT Review Details
02/07/2025 DEVELOPMENT PACKAGE NEW v.3 02/18/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0924-00264
Permit Status: Inspections
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Outstanding Activity Conditions - 1
Date Name
09/09/2025 CRWH PLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0924-00264
Permite Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/20/2026 For trash and recycling enclosures N/A Partial Pass Dumpster enclosure footing excavation and reinforcement are good. Okay to pour footing.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0924-00264
Permit Description: Proposed development of new Circle K fueling canopy and convenience store.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/22/2026 NPPO Pre-Construction Passed NPPO plants are marked and protected in accordance with approved plans.
01/22/2026 PDSD Engineering Division Pre-Construction SITE Passed 1/22/26 - Site meeting held today. Items that need addressed: install wattle to prevent runoff, stake porta-potties to prevent tipping, post SWPPP signage. Once complete, schedule "Stormwater Initial" inspection.
02/09/2026 SITE - Stormwater Setup and Controls Passed Prescribed SWPPP measures are in place: wattle along south border, track-out rock. Un-permitted concrete washout at southeast corner needs,to be mitigated. Stockpile at southeast corner needs wattle. SWPPP book needs to be maintained and kept onsite at all times.

Documents

File Name Document Type  
1_DRAINAGE REPORT_V1.PDF DOCUMENTS VIEW
1_GEOTECHNICAL REPORT_V1V1_V1.PDF DOCUMENTS VIEW
1_TITLE REPORT_V1.PDF DOCUMENTS VIEW
1_TRAFFIC REPORT_V1.PDF DOCUMENTS VIEW
2_TECHNICAL STANDARDS MODIFICATION REQUEST_V1.PDF DOCUMENTS VIEW
2_DEVELOPMENT PACKAGE_V2 APPROVED.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DEQ_FUGITIVEDUSTPERMIT_20250507_144330_V1.PDF DOCUMENTS VIEW