Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
8790 E SPEEDWAY BL
Apply Date:
09/12/2023
Applicant:
Description:
Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd

Permit Reviews

Permit Number - TD-DEV-0923-00393
Permit Status: Complete
Permit Description: Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd
Start Date Submittal Complete Date Status  
05/30/2024 DEVELOPMENT PACKAGE NEW v.5 09/11/2024 APPROVED Review Details
09/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/01/2025 APPROVED Review Details
09/14/2023 DEVELOPMENT PACKAGE NEW v.1 09/20/2023 REQUIRES RESUBMIT Review Details
10/13/2023 DEVELOPMENT PACKAGE NEW v.3 11/13/2023 REQUIRES RESUBMIT Review Details
10/04/2023 DEVELOPMENT PACKAGE NEW v.2 10/12/2023 REQUIRES RESUBMIT Review Details
03/15/2024 DEVELOPMENT PACKAGE NEW v.4 04/19/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0923-00393
Permite Description: Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
04/14/2025 SITE - Stormwater Setup and Controls N/A Complete (Recurring) Contractor called in the wrong inspection contractor needs to call in rebar inspection or wall inspection
04/23/2025 COT - ENGR - Stormwater N/A Partial Pass Contractor is installing stormwater pipe on the north east corner of the building 18 inches. They install 180 annual feet total but today they’re only installing about 100 feet.
06/25/2025 SITE N/A Partial Pass Contractor just wanted to know how the grading was going to go through the paved area and the PL
07/28/2025 Consultation SITE N/A Partial Pass Contractor was asking about the Lansky. They want to add more trees. I told him to call Steve blood.
09/02/2025 PDSD Site/Engineering Division - Landscaping N/A Partial Pass 09/02/25, inspection was for a consultation on weed fabrics under riprap. Suggestions were to use Mirafe or if can be proved to be as good as Mirafe other products can be allowed.
09/24/2025 Final inspection to ensure all landscape and water harvesting SITE N/A Partial Pass The basin at the north west corner. The elevation was too high contractor is lowering the elevation

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0923-00393
Permit Description: Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd
Total Completed Inspections - 8
Date Description Inspector Results Comments
10/08/2024 NPPO Pre-Construction Passed I informed the contractor to have the track out rock before starting work also informed him that needs to call in for inspections every two weeks and that I would get him set up detailed plan for trash enclosures
03/18/2025 PDSD Site/Engineering Division - NPPO Passed
08/15/2025 ENGR - Drainage Structures Passed Rebar and forms are to Pad standard 505
09/05/2025 Passed Ramp wall on west side of building, good to proceed with pour, make sure rebar support is every 6'
09/29/2025 ENGR Grading Final Passed
10/07/2025 ENGR Engineering Final Passed
10/07/2025 SITE - Stormwater Final Inspection Passed
10/17/2025 Final inspection to ensure all landscape and water harvesting SITE Passed

Documents

File Name Document Type  
22-350P - SWS SUBSTANTIAL COMPLETION LETTER_V1.PDF DOCUMENTS VIEW
RECEIPT_ACA_V1.PDF DOCUMENTS VIEW
SPEEDWAY_CITY OF TUCSON BUILDING DEPT - SPECIAL INSPECTION SIGNED_V1.PDF DOCUMENTS VIEW
22-350P - DRAINAGE REPORT - 022624-V2_V2.PDF DOCUMENTS VIEW
22-350P - DRAINAGE REPORT - 022624-V2_V3.PDF DOCUMENTS VIEW
22-350P - DRAINAGE REPORT - 083023_V1.PDF DOCUMENTS VIEW
222386ST FINAL_RPT SPEEDWAY - CAMINO SECO SELF-STORAGE-2_V1.PDF DOCUMENTS VIEW
24-008_JDA TUCSON SPEEDWAY SELF-STORAGE_05222024_DEV PACKAGE_REV2_V5.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW