Permit: TD-DEV-0923-00393
Permit Details
Status:
Complete
Type:
Development Package
Address:
8790 E SPEEDWAY BL
Address NEW:
8790 E SPEEDWAY BL
Apply Date:
09/12/2023
Applicant:
Description:
Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd
Permit Reviews
Permit Number - TD-DEV-0923-00393
Permit Status: Complete
Permit Description: Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2024 | DEVELOPMENT PACKAGE NEW v.5 | 09/11/2024 | APPROVED |
| 09/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/01/2025 | APPROVED |
| 09/14/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/20/2023 | REQUIRES RESUBMIT |
| 10/13/2023 | DEVELOPMENT PACKAGE NEW v.3 | 11/13/2023 | REQUIRES RESUBMIT |
| 10/04/2023 | DEVELOPMENT PACKAGE NEW v.2 | 10/12/2023 | REQUIRES RESUBMIT |
| 03/15/2024 | DEVELOPMENT PACKAGE NEW v.4 | 04/19/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0923-00393
Permite Description: Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/14/2025 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Contractor called in the wrong inspection contractor needs to call in rebar inspection or wall inspection |
| 04/23/2025 | COT - ENGR - Stormwater | N/A | Partial Pass | Contractor is installing stormwater pipe on the north east corner of the building 18 inches. They install 180 annual feet total but today they’re only installing about 100 feet. |
| 06/25/2025 | SITE | N/A | Partial Pass | Contractor just wanted to know how the grading was going to go through the paved area and the PL |
| 07/28/2025 | Consultation SITE | N/A | Partial Pass | Contractor was asking about the Lansky. They want to add more trees. I told him to call Steve blood. |
| 09/02/2025 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | 09/02/25, inspection was for a consultation on weed fabrics under riprap. Suggestions were to use Mirafe or if can be proved to be as good as Mirafe other products can be allowed. |
| 09/24/2025 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Partial Pass | The basin at the north west corner. The elevation was too high contractor is lowering the elevation |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0923-00393
Permit Description: Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2024 | NPPO Pre-Construction | Passed | I informed the contractor to have the track out rock before starting work also informed him that needs to call in for inspections every two weeks and that I would get him set up detailed plan for trash enclosures | |
| 03/18/2025 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 08/15/2025 | ENGR - Drainage Structures | Passed | Rebar and forms are to Pad standard 505 | |
| 09/05/2025 | Passed | Ramp wall on west side of building, good to proceed with pour, make sure rebar support is every 6' | ||
| 09/29/2025 | ENGR Grading Final | Passed | ||
| 10/07/2025 | ENGR Engineering Final | Passed | ||
| 10/07/2025 | SITE - Stormwater Final Inspection | Passed | ||
| 10/17/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed |