Inspection Status: Partial Pass
Inspection History: Consultation SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 03/18/2025 |
Consultation SITE |
|
Partial Pass |
contractor called in inspection for the retaining wall on the north side informed the contractor he needed a density for the footer that he did not have at the time I inspected it. He needs to have that done when I get another inspection from him if he does not have it on site at that time, the wall footing will be classified as fail |
| 07/28/2025 |
Consultation SITE |
|
Partial Pass |
Contractor was asking about the Lansky. They want to add more trees. I told him to call Steve blood. |
| 12/17/2024 |
Consultation SITE |
|
Not Ready |
Informed the contractor to call it in stormwater every two weeks. Also informed him to call in other inspections as needed. And at the first of the year, we need a hardcopy on site for all third-party testing along with the large set of plans. |