Parcel: 13335002U


Addresses:

8790 E SPEEDWAY BL


Inspection Status: Partial Pass

Inspection History

Permit Number - TD-DEV-0923-00393

Inspection Description -

Inspection Status - Partial Pass

Date Description Inspector Results Comments
04/16/2025 Partial Pass Contractors good to pour the footing in the back wall inspected the last 60 foot of the rebar footing. Contractor for me that they’re going to pour on Friday at 6 AM.
04/18/2025 Partial Pass footing pour is good, vibrated as required.
04/25/2025 Partial Pass Rebar and dimensions are good. Trench will need to be cleaned out before pour. Good to pour footing at SE corner.
04/28/2025 Partial Pass Contractor pouring 73 yards of 4000 psi concrete for the retaining wall on the east side of the building
05/02/2025 Partial Pass 5/2/25 Pre grout inspection S Retaining wall.
05/05/2025 Partial Pass Contractors good for the last 30 feet of the retaining wall on the south west corner and good to poor for for the wall on the north east corner
05/06/2025 Partial Pass Contractor poured the footers that I inspected yesterday and the one on the southwest corner and one on the north east corner
05/07/2025 Partial Pass Contract is good to pour up to the 4 foot mark for grout
05/08/2025 Partial Pass Contractor grouted southwest retaining wall and the back wall for the trash enclosure, which is connected to the retaining wall
05/21/2025 Partial Pass Contractors good to pour the footer for the screen wall on the north end of the building. Also, they can pour the footer for the trash enclosure. That’s on the southwest corner.
08/20/2025 Partial Pass Contractors good to pour the form around the bubbler on the north end of the wall that’s in front of the building
09/05/2025 Passed Ramp wall on west side of building, good to proceed with pour, make sure rebar support is every 6'