Permit: TD-DEV-0823-00345
Permit Details
Status:
Issued
Type:
Development Package
Address:
6550 S BAY COLONY DR
Address NEW:
6550 S BAY COLONY DR
Apply Date:
08/03/2023
Applicant:
Lisa Bowers
Description:
New site wall, stairs and exterior tank storage
Permit Reviews
Permit Number - TD-DEV-0823-00345
Permit Status: Issued
Permit Description: New site wall, stairs and exterior tank storage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/04/2023 | DEVELOPMENT PACKAGE NEW v.1 | 08/14/2023 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0823-00345
Permite Description: New site wall, stairs and exterior tank storage
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2023 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Walked site with Superintendent Ryan Phipps all exposed trenches and construction areas are surrounded by orange fencing and set up and controls are in place. Ryan will call in the inspection every 2 weeks until all job site work is completed. |
| 09/27/2023 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | Walked site with Superintendent Ryan Phipps, No concerns at this time. |
| 09/27/2023 | COT - ENGR - Signage Final | N/A | Not Ready | This inspection is not ready at this time and will be recalled. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0823-00345
Permit Description: New site wall, stairs and exterior tank storage
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 09/27/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Completed site walk with Superintendent Ryan Phipps and went over existing drainage areas in complex and requirements that would be needed such as wattle etc. if they will be working close to those areas, all small open trench areas are enclosed with temporary orange fencing and site is clean of debris and construction materials. Ryan will call in a stormwater inspection every 2 weeks per my request until completion of all job site work. |